Controls

Unit controlled by BAS

Each unit must be equipped with a TCI-R board. A communication bus (twisted shielded pair) must link each TCI-R to the Trane Roof Top Manager (RTM) or to the communication gateway (in the case of an external BAS). Connect one temperature sensor to each unit. LonTalk® communication interface LTCl-R board allows ICS communication between a ReliaTel™ unit and LonTalk® communication applications.

Unit controlled by Tracker™ supervisor

The units must also be equipped with the TCI-R communication board. One remote sensor is required on each unit for a constant flow volume. In the case of a variable flow installation (VariTrac™) these sensors must not be installed. A twisted shielded pair must be used for the communication link. The main functions of the Tracker™ supervisor are control of setpoints, timetable management (Programming) and display of faults. For more details refer to the supervisor documentation.

32

RT-SVX19A-E4

Image 32 Contents
Installation Operation Maintenance Safety recommendations ForewordReception Reception in France onlyWarranty Maintenance contractRefrigerant StorageContents Unit Options Unit handling Reception of unitsRooftop unit Unit size Roof curb Installation TKD-WKD-YKD accessoriesSling lengths and maximum unit weight Dimensions/Weights/Clearances Minimum clearances Minimum clearances mmWeights of Options & accessories Weigths & center of gravity FigureUnit mounting on roof Installing the unitInstalling the unit on the ground Horizontal discharge units TKH,WKH,YKH Downflow discharge units TKD,WKD,YKD Using the rooftop curbConnection of duct network Condensate drain piping Condensate drain line connectionGas pipework installation Gas leak check procedureGas burner models UnitFilter installation Filter arrangementFan Speed RPM Standard Drive Supply fan adjustmentMotor sheave / Fan speed To increase airflow To decrease airflowTo increase belt tension Belt tensioningYKD/YKH Pressure drop through accessories Component air pressure dropsTKD/TKH Pressure drop through accessories Airflow EU2/G2 EU4/G4 100%TKD TKHWKD/WKH Pressure drop through accessories Filter 100%WKD WKHSupply fan performances YK 155 External static pressureYK 175 External static pressure YK 250 External static pressure TK 175 External static pressure TK 200 External static pressure275 300 TK 250 External static pressureExternal Static Pressure Pa 275 300 WK 155 External static pressure Factory supplied Disconnect switch Option Power wiringElectrical connection TKD/TKH, WKD/WKH units YKD/YKH unitsElectrical data YKD/YKH Unit Wiring Electrical Characteristics Unit ampsScroll compressors Compressor electrical phasing With Electric heat 155 175 200 250 Compressor Outdoor Fan155 175 200 250 Indoor Fan 155 200 CompressorElectrical data TKD/TKH Supply fan motor Electrical data Combustion Blower Motorr Electrical data YKD/YKH Supply fan motorElectrical data WKD/WKH Supply fan motor Control wiring Zone sensor wire size and maximum lengthMaximum length Zone sensor wire size Unit controlled by thermostatUnit controlled by BAS Unit controlled by Tracker supervisorWall-mounted and duct-mounted CO2 sensors SpecificationsCO2 sensors Power supply requirements Wiring the wall-mounted CO2 sensorWiring the duct-mounted CO2 sensor CO2 sensor wire sizeCO2 sensor maintenance Mounting the duct-mounted CO2 sensorRemote potentiometer dimensions Remote potentiometerFire thermostat Duct mounting of fire thermostatHigh temperature safety thermostat Remote fault relayClogged filter detector Smoke detectorCommunication Interfaces Hot water coil Installation and connection Hot water coilDown flow units only Water connection inlet/outlet 1 ¼ ISO R7Electric Heater Soft Starter25% fresh air hood 25% manual fresh air hoodBarometric relief Downflow versionOperation Operation with a conventional thermostatConventional thermostat Heat Pump Thermostat signals are as followsConventional thermostat Gas/ Electric, Electric Heat Unoccupied mode Cooling/Economizer OperationCooling/Economizer Operation with Thermostat1,2 OK toSetting the economizer or 0-50% motorized hood option ECA board LEDMinimum fresh air adjustment Test mode procedure at the ReliaTel control board Test proceduresPower-up initialization Step Test Mode Auto Test ModeTest modes StepUnit start-up Gas valveMarking category of the gas section in different countries Gas burner dataStarting the unit in cooling mode Final installation checklistCheck torque of power cables contact Operating pressuresCooling without an Economizer Evaporator Fan OperationLow Ambient Operation Cooling with an EconomizerPotentiometer Setting Economizer Set-UpReliaTel Control Heating Operation Ignition ModuleLED status Final installation checklistDiagnostics Refrigerant charge End user routine maintenanceAir filters Hot water coil option Service technician maintenanceCondenser coil Troubleshooting System Status Checkout ProcedureService Failure System failureHeating Failure Cooling FailureResetting Cooling and Ignition Lockouts Zone Temperature Sensor ZTS Service IndicatorClogged Filter Switch Fan Failure SwitchTemperature/resistance coefficient is negative Thermistor Resistance / Temperature ChartLiterature order number