LG Electronics MP03-VDLPM Framing Dimensions for Roof Pitch, 12/12, Swivel Joint

Page 13

Loop the tape around the vent, securing the ends of the tape to the framing. If desired, sheet metal screws #6 x 1/2" length may be used to secure the support straps to the vent pipe. Refer to Figure 17.

H. Change vent direction to horizontal/in- clined run - At transition from or to a horizon- tal/inclined run, install the SV4.5E45 and SV4.5E90 elbows in the same manner as the straight vent sections. The elbows feature a twist section to allow them to be routed about the center axis of their initial collar section to align with the required direction of the next vent run element. Twist elbow sections in a clockwise direction only so as to avoid the possiblity of unlocking any of the previously connected vent sections. See Figure 18.

4-13/16"

8-1/8"

(206 mm)

(122 mm)

 

Swivel Joint

Swivel Joint

(360°

swivel)

(360° swivel)

 

 

SV4.5E45

SV4.5E90

(45° Elbow)

(90° Elbow)

Figure 18

I. Continue installation of horizontal/inclined sections - Continue with the installation of the straight vent sections in horizontal/inclined run as described in Step E. Install support straps every 5' (1.52 m) along horizontal/ inclined vent runs using conventional plumber’s tape. It is very important that the horizontal/ inclined run be maintained in a straight (no dips) and slightly elevated plane in a direc- tion away from the fireplace 1/4" per foot (20

mmper meter) which is ideal, though rise per foot run ratios that are smaller are acceptable all the way down to at or near level.

It is important to maintain the required clear- ances to combustibles at the top and bottom for all horizontal/inclined runs.

Maintain a minimum 1" (25 mm) clearance to combustible materials for all vertical vent elements.

Clearances for horizontal vent elements are 1" (25 mm) at the sides and 1" (25 mm) on the bottom. Clearances above horizontal vent elements are 3" (76 mm) for all models and all applications. Exception: Clearance is 5" (127 mm) for MPLDV35, MPLDV40 & MPLDV45, when the center line of the hori- zontal run is less than 48" (1219 mm) above the fireplace top wrapper surface.

H. Frame roof opening - Identify location for vent at the roof. Cut and/or frame opening per Roof Framing Chart and Figure 19.

C

D

Framing Dimensions for Roof

Pitch

C

D

 

 

 

0/12

10-1/2 in.

10-1/2 in.

 

(267 mm)

(267 mm)

 

 

 

6/12

10-1/2 in.

12 in.

 

(267 mm)

(305 mm)

 

 

 

12/12

10-1/2 in.

17-3/4 in.

 

(267 mm)

(451 mm)

 

 

 

Figure 19

J. Install the roof flashing - Extend the vent sections through the roof structure. Install the roof flashing over the vent section and posi- tion such that the vent column rises vertically (use carpenters level) (Figure 20 ). Nail along perimeter to secure flashing or adjust roofing to overlap the flashing edges at top and sides only and trim where necessary. Seal the top and both sides of the flashing with waterproof caulking.

Figure 20

K. Install the storm collar - Install the storm collar, supplied with the flashing, over the vent/flashing joint. See Figure 21. Loosen the storm collar screw. Slide collar down until it meets the top of the flashing. Tighten the adjusting screw. Apply non-combustible caulk- ing or mastic around the circumference of the joint to provide a water tight seal.

NOTE: DIAGRAMS & ILLUSTRATIONS NOT TO SCALE.

Storm

Collar

Figure 21

L. Install the vertical termination - The final step involves installation of the SV4.5CGV-1 Vertical Termination. Extend the vent sections to the height as shown in the "Vertical vent termination section" on page 6. The SV4.5CGV-1 Vertical Termination (Figure 22 ) installs in the exact same fashion as any other Secure Vent section. Align the termination over the end of the previ- ously installed section, adjusting the radial align- ment until the four locking dimples of the termi- nation are aligned with the inlets of the four incline channels of the last vent section. Push the termination down until it fully engages, then twist the termination clockwise running the dimples down and along the incline channels until they seat at the end of the channels.

Figure 22

If the vent system extends more than 5' (1.5

m)above the roof flashing, stabilizers may be necessary. Additional screws may be used at section joints for added stability. Guide wires may be attached to the joint for additional support on multiple joint configurations.

13

Image 13
Contents MPLDV-35NM-2 OTL Report No -F-47-5Table of Contents All Models Millivolt And Electronic ModelsModel Orifice size Nat PropLocation Typical LocationsModel No Shelf Height inches mm Top Vent ApplicationAppliance and Vent Clearances Vertical Vent Termination ClearancesVent Termination Clearances Horizontal Vent Termination ClearancesDetailed Installation Steps Typical Installation SequenceRouting GAS Line Horizontal Vent Termination ClearancesMeter/regulator assembly Canadian Installation US Installation= Clearance to service regulator vent outlet Feet 91cm Inches 30cm1030 1162 419 1092 Model No45 1/4 67 1/4 47 1/2 19 3/8 33 5/8 Corner Framing with Square Termination SV4.5HT-2Model No These fireplaces must be vented directly to the outside Install the Vent SystemVertical Termination Systems Roof Vent Section Length Chart Vent / 45 Degree Starter Elbow Connection 10 1/2 Min 267 mmConnection 12/12 Framing Dimensions for Roof PitchIf the vent system extends more than 5 Swivel JointSupport Vertical Vent FIGURES/TABLESBracket Ceiling Firestop/Spacer SV4.5VF Detail ViewPlan the vent run Horizontal Outside Wall Termination SystemInstall firestop/spacer at ceiling Typical Horizontal Vent InstallationFrame exterior wall opening Four incline channels on the collar refer to onInstall the desired termination Install Firestop/Spacer at exterior wallMm as shown in Figure Slide the collars of the termination ontoExterior Wall Thickness Horizontal Vent FIGURES/TABLESConnection Directly AT Appliance Connection not Directly AT ApplianceWall Wall Firestop/SpacerCeiling Firestop/Spacer SV4.5VF WallPull and extend the inner flexible vent pipe Install the Outer Flex PipePull and extend the outer flexible vent pipe Route Flex VentMillivolt Wiring See Figure Field WiringElectronic Wiring See Figure After the wiring is complete, replace the cover plateConnecting GAS Line Installing the Glass Door Installing the Glass Door and Optional HoodING Embers and Volcanic Stones Burner Adjustment Burner AdjustmentsFinishing Requirements Wall DetailsCold Climate Insulation Installation AccessoriesMantel Clearances Cat. No. Model No. Description CatGAS Conversion Kits .2 Installation CodeMillivolt Appliances Model No Orifice size Natural Pilot Orifice Electronic Appliances Dexen Electronic ValvesPage Page West Taft Avenue Orange, CA 850,043M REV. E 06/2008