LG Electronics MP03-VDLPM Pilot Orifice Electronic Appliances Dexen Electronic Valves

Page 29

Pressure

Regulator

Remove

These

Components

Figure 48

Pilot Stage

Terminal

Ground (TP)

TP

Gas Outlet

To Burner

Pressure-Tap (Inlet)

 

IN

TH TP

 

LO

HI

TH

OUT

 

 

VENT

Pilot Gas

Outlet

PILOT

 

Supply

 

IN

Gas Inlet

 

 

Step 5. Attach manometer to the manifold side pressure test fitting and verify manifold pressure reads 3.5 inches water column (0.87 kPa) for natural gas, and 10.0 inches water column (2.49 kPa) for propane gas.

Burner Stage

Regulator

Pressure-Tap

Terminal

Mounting Screw

(Manifold)

Figure 50

Step 6. Refer to Figure 49 and remove the pilot hood assembly to access the hexed pilot orifice. Remove and replace the orifice with the one provided with the kit.

Pilot

Orifice

Figure 49

Electronic Appliances

Step 7. Dexen Electronic Valves -

See Figure 50 and the instructions provided with the kit. Remove and discard the two pressure regulator mounting screws. Re- move the pressure regulator and diaphragm. Discard all removed components. Ensure the provided diaphragm is installed properly onto the replacement pressure regulator and install the new pressure regulator using the new screws supplied with the kit. Tighten screws.

See Figure 51 and replace the pilot orifice as follows: Remove pilot hood assembly to access the phillipped pilot orifice. Remove and replace the orifice with the one pro- vided with the kit. Exercise extreme care to prevent damage to or breakage of the ignitor assembly.

ELECTRONIC

 

Sensor

Pilot

 

Hood

Ignitor

 

Note: If the ignitor is damaged, a replacement kit is available, order Catalog Number 87L54.

Figure 51

All Models

Step 8. (Refer to Figure 47 on page 28 )

A. Remove the orifice from the manifold and replace it with the one provided in the kit. See the following table for orifice sizes for natural and propane models. Figure 52 illustrates the orifice.

B. Retrieve the burner and slide the venturi tube over the orifice. Set the shutter adjusting opening as shown in Figure 43, page 25.

Model No.

Orifice size

 

 

Natural

Propane

 

 

 

 

MPLDV-30

0.070"

#61

(0.039")

 

 

 

 

 

MPLDV-35

#45

0.048"

(0.082")

 

 

 

 

 

MPLDV-40

#41

#54

(0.046")

(0.055")

 

 

 

 

MPLDV-45

#40

#53

(0.098")

(0.595")

 

 

 

 

Figure 52

Step 9. Reassemble the remaining compo- nents by reversing the procedures outlined in the preceding steps. Use pipe joint compound or Teflon tape on all pipe fittings before install- ing (ensure propane resistant compounds are used in propane applications, do not use pipe joint compounds on flare fittings).

Step 10. Attach the conversion label provided in the conversion kit to the rating plate on the appliance.

Step 11. Turn on gas supply and test for gas leaks.

NOTE: DIAGRAMS & ILLUSTRATIONS NOT TO SCALE.

29

Image 29
Contents MPLDV-35NM-2 OTL Report No -F-47-5Table of Contents All Models Millivolt And Electronic ModelsModel Orifice size Nat PropLocation Typical LocationsModel No Shelf Height inches mm Top Vent ApplicationAppliance and Vent Clearances Vertical Vent Termination ClearancesVent Termination Clearances Horizontal Vent Termination ClearancesDetailed Installation Steps Typical Installation SequenceRouting GAS Line Horizontal Vent Termination ClearancesMeter/regulator assembly Canadian Installation US Installation= Clearance to service regulator vent outlet Feet 91cm Inches 30cm1030 1162 419 1092 Model No45 1/4 67 1/4 47 1/2 19 3/8 33 5/8 Corner Framing with Square Termination SV4.5HT-2Model No Vertical Termination Systems Roof Install the Vent SystemThese fireplaces must be vented directly to the outside Vent Section Length Chart Connection 10 1/2 Min 267 mmVent / 45 Degree Starter Elbow Connection 12/12 Framing Dimensions for Roof PitchIf the vent system extends more than 5 Swivel JointSupport Vertical Vent FIGURES/TABLESBracket Ceiling Firestop/Spacer SV4.5VF Detail ViewPlan the vent run Horizontal Outside Wall Termination SystemInstall firestop/spacer at ceiling Typical Horizontal Vent InstallationFrame exterior wall opening Four incline channels on the collar refer to onInstall the desired termination Install Firestop/Spacer at exterior wallMm as shown in Figure Slide the collars of the termination ontoExterior Wall Thickness Horizontal Vent FIGURES/TABLESConnection Directly AT Appliance Connection not Directly AT ApplianceWall Wall Firestop/SpacerCeiling Firestop/Spacer SV4.5VF WallPull and extend the inner flexible vent pipe Install the Outer Flex PipePull and extend the outer flexible vent pipe Route Flex VentMillivolt Wiring See Figure Field WiringElectronic Wiring See Figure After the wiring is complete, replace the cover plateConnecting GAS Line ING Embers and Volcanic Stones Installing the Glass Door and Optional HoodInstalling the Glass Door Burner Adjustment Burner AdjustmentsFinishing Requirements Wall DetailsMantel Clearances Installation AccessoriesCold Climate Insulation Cat. No. Model No. Description CatMillivolt Appliances .2 Installation CodeGAS Conversion Kits Model No Orifice size Natural Pilot Orifice Electronic Appliances Dexen Electronic ValvesPage Page West Taft Avenue Orange, CA 850,043M REV. E 06/2008