Align the legs of the draft hood with the slots provided. Insert the legs and secure the draft hood to the water heater’s top with the four screws provided as shown in Figure 9. Do not alter the draft hood in any way. If you are replacing an existing water heater, be sure to use the draft hood supplied with this water heater.

Vent Pipe Size

It is important that you follow the guidelines in these instructions for sizing a vent pipe system. If a transition to a larger vent size is required, the vent transition connection must be made at the draft hood outlet.

Vent Connectors

1.Type B, Double wall, U.L. Listed Vent Pipe.

2.Single wall Vent Pipe.

Maintain the manufacturer’s specified minimum clearance from combustible materials when using type B double wall vent pipe.

Vent connectors made of type B, double wall vent pipe material may pass through walls or partitions constructed of combustible material if the minimum listed clearance is maintained.

Maintain a six inch minimum clearance from all combustible materials when using single wall vent pipe.

IMPORTANT: Single wall vent pipe cannot be used for water heaters located in attics and may not pass through attic spaces, crawl spaces or any confined or inaccessible location. A single wall metal vent connector cannot pass through any interior wall.

When installing a vent connector, please note the following (See Figures 10-12):

Install the vent connector avoiding unnecessary bends, which create resistance to the flow of vent gases.

Install without dips or sags with an upward slope of at least 1/4-inch per foot.

Joints must be fastened by sheet metal screws or other approved means. It must be supported to maintain clearances and prevent separation of joints and damage.

The length of the vent connector cannot exceed 75% of the vertical vent height.

The vent connector must be accessible for cleaning, inspection, and replacement.

Vent connectors cannot pass through any ceiling, floor, firewall, or fire partition.

It is recommended (but not mandatory) that a minimum 12 inches of vertical vent pipe be installed on the draft hood prior to any elbow in the vent system.

IMPORTANT: Existing vent systems must be inspected for obstructions, corrosion, and proper installation.

Chimney Connection

IMPORTANT: Before connecting a vent to a chimney, make sure the chimney passageway is clear and free of obstructions. The chimney must be cleaned if previously used for venting solid fuel appliances or fireplaces. Also consult local and state codes for proper chimney sizing and application or, in the absence of local and state codes, the “National Fuel Gas Code”, ANSI Z223.1(NFPA 54)-current edition.

The connector must be installed above the extreme bottom of the chimney to prevent potentially blocking the flue gases.

The connector must be firmly attached and sealed to prevent it from falling out.

To aid in removing the connector, a thimble or slip joint may be used.

The connector must not extend beyond the inner edge of the chimney as it may restrict the space between it and the opposite wall of the chimney (Figure 10).

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

3

 

FT.

 

 

 

 

 

 

 

 

 

 

 

2 FT. Minimum Above Any Object

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Within 10 FT. Horizontally

Support Strap

Minimum

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Maintain

 

 

 

 

 

 

 

Seal

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Clearance*

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Do Not Extend

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Vent Beyond Edge

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Of Chimney

Vent

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Connector

 

 

Slope

Up

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

1/4 Inch

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Per Foot

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Minimum

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Chimney Termination Vent System

FIGURE 10.

Do not terminate the vent connector in a chimney that has not been certified for this purpose. Some local codes may prohibit the termination of vent connectors in a masonry chimney.

Vertical Exhaust Gas Vent

Vertical exhaust gas vents must be installed with U.L. listed type B vent pipe according to the vent manufacturer’s instructions and the terms of its listing.

It must be connected to the water heater’s draft hood by a listed vent connector or by directly originating at the draft hood opening.

Vertical gas vents must terminate with a listed cap or other roof assembly and be installed according to their manufacturer’s instructions.

Gas vents must be supported to prevent damage, joint separation, and maintain clearances to combustible materials (Figures 11 and 12).

IMPORTANT: This gas vent must be terminated in a vertical position to facilitate the removal of the burnt gases.

An unused chimney flue or masonry enclosure may be used as a passageway for the installation of a gas vent (Figure 12).

Common (combined) venting is allowable with vertical type B vent systems and lined masonry chimneys as long as proper draft for the water heater is established under all conditions of operation. CAUTION: DO NOT common vent this water heater with any power vented appliance.

Figures 10-12 are examples of vent pipe system installations and may or may not be typical for your specific application. Consult the “National Fuel Gas Code”, NFPA 54, ANSI Z223.1-current edition and the guidelines set forth by prevailing local codes.

14

Image 14
Contents Residential GAS Water Heaters Table of Contents Safe INSTALLATION, USE and Service Safety PrecautionsFire or Explosion Hazard Typical Installation GET to Know Your Water Heater GAS ModelsImportant Information About This Water Heater Installing Your GAS Water HeaterUnpacking the Water Heater Excessive Weight Hazard Consumer InformationCarbon Monoxide Poisoning Hazard Location RequirementsSite Location Clearances and Accessibility State of CaliforniaGas Requirements Gas Pressure TestingGAS Supply Gas PipingGas Pipe Capacity Table Confined Space Combustion AIR & VentilationUnconfined Space Minimum Btuh InputLouvers and Grilles All Air from Inside the BuildingAll Air from Outdoors Draft Hood Installation Vent Pipe SystemChimney Connection Vent ConnectorsVent Pipe Size Vertical Exhaust Gas VentPiping Installation Water System PipingTemperature and Pressure Relief Valve Closed System/Thermal ExpansionCombination Space Heating/Potable Water System Temperature & Pressure Relief ValveRelief Valve and Pipe Insulation Discharge LineElectrical Connections Solar InstallationWiring Diagram Installation Checklist Important Information about this Water HeaterOperating Your Water Heater Operating InstructionsBurn Hazard Water Heater OperationChecking the Draft Emergency Shut Down Water Temperature RegulationBurner Flames Condensation Safety Shut-offOperational Conditions Water Heater SoundsDraining and Flushing Routine Preventive MaintenancePowered Anode Operation Removing the Manifold/Burner Assembly Maintenance of Your Water HeaterReplacement Parts Removing the Burner from the Manifold/ Burner AssemblyReplacing the Manifold/Burner Assembly Replacing the Flame Sense/Hot Surface igniter AssemblyCleaning the Combustion Chamber and Air Diverter Assembly Replacing the Gas Valve Removing and Replacing the Gas Control Valve/ThermostatRemoving the Gas Control Valve/Thermostat Pressurized Combustion Chamber System Operational Checklist Troubleshooting ChartCont Control Display Troubleshooting Control Display Status Problem SolutionControl Display Status Problem Solution FV-SENSE and Open Flashing Troubleshooting Flowchart YESRepair Parts List Repair Parts IllustrationListed Parts Kits and Illustrations Page Page Page Limited Residential GAS Warranty YearImportant Information

317998-002, GP 6 50YPC T 100, GP 6 40YPC T 100 specifications

State Industries has long been at the forefront of technological advancements and innovative design in the industrial market. The company has developed a range of high-efficiency products designed for various applications, including the GP 6 40YPC T 100 and GP 6 50YPC T 100 models, as well as the 317998-002 component. Each product in this lineup is characterized by specific features and cutting-edge technologies tailored to meet diverse operational needs.

The GP 6 40YPC T 100 model boasts a robust construction aimed at durability and resilience in demanding environments. Its design incorporates advanced materials that resist wear and corrosion, ensuring a prolonged lifespan and reduced maintenance requirements. The model operates efficiently even in high-pressure scenarios, making it suitable for various industrial applications, including manufacturing and processing.

In contrast, the GP 6 50YPC T 100 model is designed with a focus on maximizing performance and energy efficiency. It features an optimized airflow system that enhances heat dissipation, preventing overheating and maintaining operational integrity. This model is ideal for applications that require continuous operation, as it minimizes downtime and maximizes productivity. Additionally, the GP 6 50YPC T 100 is equipped with smart technology that monitors performance metrics, providing real-time feedback on operational efficiency.

The 317998-002 component serves as a critical element in both models, acting as a versatile interface that integrates seamlessly with existing systems. It is designed to enhance connectivity and facilitate communication between various industrial components, promoting improved efficiency and ease of integration.

Both the GP 6 models and the 317998-002 feature user-friendly interfaces, allowing operators to easily manage and adjust settings. This focus on user experience helps to reduce training time and improve overall operational efficiency. Furthermore, both models adhere to strict industry standards, ensuring reliability and safety in all conditions.

In summary, State Industries' GP 6 40YPC T 100 and GP 6 50YPC T 100 models, along with the 317998-002 component, represent the pinnacle of innovation and reliability in industrial solutions. Their advanced features, technologies, and characteristics make them suitable choices for organizations looking to enhance productivity and operational efficiency in a variety of applications. With a commitment to quality and performance, State Industries continues to set the standard for excellence in the industry.