State Industries SUF-130-300, SUF-130-400 warranty

Page 34

TWO TEMPERATURE - ONE HEATER HIGH TEMPERATURE

WITH RECIRCULATION OF SANITIZING LOOP

DANGER

TEMPERATURE SETTING SHOULD NOT EXCEED SAFE TEMPERATURE AT FIXTURES. SEE WATER TEMPERATURE CONTROL WARNING ON PAGE 3. IF HIGHER PREHEAT TEMPERATURES ARE NECESSARY TO OBTAIN ADEQUATE BOOSTER OUTPUT, ADD AN ANTI-SCALD VALVE FOR HOT WATER SUPPLIED TO FIXTURES.

CAUTION: IF BUILDING COLD WATER SUPPLY HAS A BACK- FLOW PREVENTER, CHECK VALVE OR WATER METER WITH CHECK VALVE PROVISIONS FOR THERMAL EXPANSION OF WATER IN THE HOT WATER SYSTEM MUST BE PROVIDED.

*PIPE RELIEF VALVE TO OPEN DRAIN

INSTALL IN ACCORDANCE WITH LOCAL CODES

NOTE 1: TOGGLE SWITCH CONTROLS 180°F (82°C) WATER CIRCULATION. INSTALL ON OR CLOSE TO DISHWASHER. TOGGLE SWITCH MUST BE CLOSED (ON) DURING THE RINSE OPERATION AND OPEN (OFF) WHEN DISHWASHER IS NOT OPERATING OR WHEN ON LONG STANDBY.

NOTE 2: INSTALL LINE TEMPERATURE CONTROL IN AN UNINSULATED TEE BEYOND THE DISHWASHER TAKEOFF IN THE SANITIZING LOOP. CONTROL SHOULD BE SET AT 185°F (85°C).

NOTE 3: ADJUST PLUG COCK SO THE SANITIZING LOOP FLOW RATE DOES NOT CAUSE UNNECESSARY TURBULENCE IN THE TANK.

NOTE 4: IF TEMPERED WATER IS RECIRCULATED, RETURN LINE SHOULD BE CONNECTED AT POINT A.

34

Image 34
Contents Commercial GAS Water Heater ROUGH-IN-DIMENSIONS ForewordTable of Contents FeaturesAT a Glance Quick Installation Tips Horizontal Sidewall Venting Vertical Rooftop VentingHigh Limit Switch E.C.O Water Temperature Setpoint Adjustment ProcedureDishwashing Machine Requirement Required Ability Installation InstructionsCirculating Pump Insulation BlanketsAIR Requirements ClearancesHard Water Unconfined SpaceInstallation of Carbon Monoxide Detectors VentingCanadian Direct Vent US Horizontal Vent Direct Venting Direct Vent Terminal InstallationVent Pipe Termination 3x 4 PVC Reducer with Intake ScreenInstallation Sequence Vertical Vent Terminal InstallationInstallation of Vent System Vent Length TableControls and Switches HOT Surface Igniter GAS PipingConnection of GAS Pipe System Connections Heater Wiring Water Potable Heating and Space HeatingSUF 130-300 Wiring Diagram SUF 130-400 Wiring Diagram Sequence of Operation OperationElectronic Control OverviewAdjusting the Operating Set Point Changing the Display Units Fault and Warning ConditionsExample of a Warning Example of a Fault Advanced Diagnostics Information Access to the Current Fault or WarningViewing the Fault History Viewing Information About the HeaterOperating Instructions Prior to Start UP Required AbilityOperating Instructions Maintenance General InformationSediment Removal FlushingDraining Lime Scale RemovalDrain Valve and Access Panels Powered Anode SystemVent System Installation Diagrams Page Must be Identical Heaters Pipe Relief Valve to Open Drain Page Multiple Unit Installations Troubleshooting Motor will not RUN Motor RUNS, Burner Lights Momentarily Then Locks OUTNoisy Burner Operation Replacement PartsGAS Fails to Shut OFF Model SUF-130-300/400 NEA /PEA Limited Warranty Tank