Drolet 75281 Brick and Insulation Installation HT-2000, HT-2000 Refractory Bricks Assembly

Page 8

BRICK AND INSULATION INSTALLATION (HT-2000)

The stove is normally supplied with secondary air tubes in position. To install the baffle bricks and white ceramic insulation, it’s necessary to remove the two front secondary air tubes. First place only one baffle brick and one white ceramic insulation. Use the same method to put the other baffle brick and insulation. Put back in place the secondary air tubes.

Install the yellow insulation and the 6" x 8" or 6" x 6" bricks. Install the side and bottom bricks.

Figure 3: HT-2000 Refractory Bricks Assembly

7

Image 8
Contents OWNER`S Manual Drolet EPA Woodstoves Read and Keep this Manual for ReferenceTable of Contents Introduction Technical Specifications OverallTips on Wood Heating Assembly Pedestal and Decorative Sidewall InstallationBricks and Insulation Installation HT-1600 HT-1600 Refractory Bricks AssemblyBrick and Insulation Installation HT-2000 HT-2000 Refractory Bricks AssemblyAIR Tubes Installation HT-2000 Air Tubes InstallationDoor Adjustment Door AdjustmentBenefits of Installing a Blower Installation Positioning the StoveFloor Protector Clearances CanadaReduced Clearances Type of ProtectionChimney Chimney Connector Stove Pipe Typical Installations Factory Built ChimneyClay liner Factory Built Thimble Brick Thimble Woodstove Utilization Average Energy Yield Of One Air Dried Cord Of Cut WoodIgnition Testing Your WoodFirst Fires Heating Reloading Creosote Formation and Need for RemovalASH Disposal Maintenance GlassGasketing PaintDrolet Limited Lifetime Warranty