Drolet 75281 owner manual AIR Tubes Installation HT-2000, Air Tubes Installation

Page 9

AIR TUBES INSTALLATION (HT-2000):

The secondary air tubes are painted different colours . The back tube is yellow, the middle on is red and the front is unpainted. Before installing, make sure the locating holes in the tubes (holes near one end of the tube) are on the left side. Insert one tube in the right side air channel and slide it to the right as much as possible. Bring the left end of the tube aligned with the ring welded to the left air channel. Move the tube to the left until the locating holes are aligned with those in the ring. Insert a cutter pin to hold in place. The air injection holes should be facing down in the front and middle tubes.

Figure 4: Air Tubes Installation

8

Image 9
Contents Read and Keep this Manual for Reference OWNER`S Manual Drolet EPA WoodstovesTable of Contents Introduction Overall Technical SpecificationsTips on Wood Heating Pedestal and Decorative Sidewall Installation AssemblyHT-1600 Refractory Bricks Assembly Bricks and Insulation Installation HT-1600HT-2000 Refractory Bricks Assembly Brick and Insulation Installation HT-2000Air Tubes Installation AIR Tubes Installation HT-2000Door Adjustment Door AdjustmentBenefits of Installing a Blower Positioning the Stove InstallationFloor Protector Canada ClearancesType of Protection Reduced ClearancesChimney Chimney Connector Stove Pipe Factory Built Chimney Typical InstallationsClay liner Factory Built Thimble Brick Thimble Average Energy Yield Of One Air Dried Cord Of Cut Wood Woodstove UtilizationTesting Your Wood First FiresIgnition Heating Creosote Formation and Need for Removal ReloadingASH Disposal Glass MaintenanceGasketing PaintDrolet Limited Lifetime Warranty