Avalon Stoves Rainier Chimney Termination Requirements, Outside Air Requirements, Slanted Roofs

Page 11

Stove Installation (for qualified installers only)

11

Chimney Termination Requirements

Must have an approved cap (to prevent water from entering)

Must not be located where it will become plugged by snow or other material

Must terminate at least 3' above the roofa n d at least 2' above any portion of the roof within 10'

Slanted Roofs

Chimney must extend 3' above the roof

Chimney must extend 2' above any portion of the roof within 10' of the chimney

Flat

Chimney must extend 3' above the roof

Chimney must extend 2' above any portion of the roof within 10' of the chimney

Outside Air Requirements

Required for mobile homes & in certain localities (check with building officials)

Must not be drawn from an enclosed space (garage, unventilated crawl space)

Requires the optional outside air boot (for legs) or pedestal.

When using outside air, find a location where the chimney and outside air hole do not interfere with structural members of the home.

Pedestal (with insulation)

directs air to the stove.

A hole must be cut through the floor protection and floor and the rodent screen nailed in place here (see the optional equipment instructions for exact sizes)

Outside

Air Boot

Air may be drawn from a ventilated crawl space or use an air duct.

Optional Air Duct (must not be longer than 15' and at least 16 square inches in cross section)

Outside air entrance must be placed so it does not become blocked by snow.

Travis Industries

100-01140

4 020628

Image 11 Contents
Rainier Travis Industries 100-01140 050124 Mail your Warranty Card Today, and Save Your Bill of Sale2Introduction T r o d u c t i o n Important InformationTable of Contents Ashes Safety PrecautionsHome Mobile6Features & Specifications Installation Type Considerations Planning The InstallationPreparation for Installation Stove Installation ConsiderationsFloor Protection Requirements Clearances Stove Placement RequirementsDrafting Chimney RequirementsFlat Chimney Termination RequirementsOutside Air Requirements Slanted RoofsCombustible Non-Combustible Alcove Installation RequirementsRainier Minimum Clearance See Illustration belowMinimum Clearance Rainier See Illustration below With Reduced Clearance ConnectorMobile Home Requirements Chimney Cap See the section Chimney T E T e r i o r C t o r y I l t I m n e yInterior or Exterior Masonry Chimney Clearance fireplaces Insert Installation ConsiderationsSurround Panels 28 to 144 not approved for zeroHearth Requirements Insert Placement RequirementsInsert Size Requirements see Illustration below Drafting Performance Leveling Bolt InstallationMasonry Fireplace Requirements Zero-Clearance Metal Fireplace RequirementsBlock-Off Plate Template Block-Off Plate InstallationInsert with Positive Connection Insert with Opening the Door Safety NoticeOperating Your Appliance Before Your First FireStarting a Fire Ash Removal Adjusting the Burn RateApproximate Air Control Settings Normal Operating Sounds Optional Blower OperationRe-Loading the Stove Overnight BurnSelecting Wood Hints for BurningTroubleshooting Remove Ash if necessary Daily Maintenance while stove is in useClean the Glass if necessary Maintaining Your ApplianceCreosote Formation and Need for Removal Monthly Maintenance while appliance is in useDoor and Glass Inspection Firebrick and Baffle Inspection Yearly MaintenanceCleaning the Air Duct and Blower if applicable Touch Up PaintReplacing the Door Handle Door PartsReplacing the Glass Replacing the Door GasketTravis Industries 100-01140 060417 Floor and Side Firebrick Removal & ReplacementFirebox Parts Baffle Removal & Replacement Air Tube Removal & ReplacementYears 6 & 7 Coverage Parts only Limited 7 Year WarrantyYears 1 & 2 Coverage Parts & Labor Years 3 Through 5 Coverage Parts & LaborListing Label Freestanding InstallationTravis Industries 100 080103 Optional EquipmentPedestal Top View Outside Air Installation for wood stoves onlyInstall the wire clip following the directions below Rear Blower Installation Part numberOutside Air Boot Installation Part number Z e Size on Insert w trim Required for face seal installations onlySurround Panels see s below Travis Industries 100-01140 051104Front Blower To Switch the Power Cord to the Left SideOptional Equipment 44Index