32Optional Equipment

3Follow the directions below to remove the natural gas orifice. Apply thread sealant to the LP orifice and tighten in place with a 1/2" open end wrench. Slide the adjustable shutter back in place over the orifice. Replace the mixing tube and secure in place with the screws.

a Remove the four screws holding the mixing tube in

place.

1/4" Nutdriver

b

Remove the mixing tube

 

 

from the air shutter by

 

sliding it to the left.

Air Shutter

c

Slide the air shutter to the fully open position (see page 19).

Burner Orifice

Manifold

d

The new LP orifice is .0625”

it has “.062”

 

stamped on it.

e

Use a 1/2” open end wrench to

unscrew the burner orifice.

1/2" Wrench

NOTE:

Screw the LP orifice in

5/16”

so the orifice shoulder protrudes 5/16” (indicating full insertion).

.

062

37

Apply thread sealant to the new orifice and install.

The old NG orifice has “37” stamped on it.

Travis Industries

4 1 2 2 1 0 4

9 3 5 0 8 1 1 7

Image 34 Contents
Cedar Manual Page Introduction Important Information Introduction1Travis Industries 2 2 1 0 5 0 8 1 1 Safety Precautions This Manual Table of Contents Specifications5 Packing List Installation WarningsInstallation Preparation Stove ClearancesFloor Protection Requirements Heater Placement RequirementsGas Line Installation Gas Inlet PressureVent Requirements Manuafacturer R i e sMeasuring Vent Lengths Approved Vent ConfigurationsRestrictor Position T ERestrictor Vertical Terminations with 0, 2, or 4 45 OffsetsOffset Length Hor. Offset Vert. Rise Position #Horizontal Terminations with One 90 Elbow Restrictor Restrictor Position # Vertical Terminations with Two 90 Elbows 5feet 10feet 15feet 20feet Restrictor Position #Position Rise every 12 of travelTermination Requirements see the illustration below Finalizing the Installation Correct Opening the Door Log Set and Coal Installation Location Safety NoticeOperation21 Gas Control Valve22Operation Starting The Pilot FlameStarting the Heater for the First Time Adjusting the Flame HeightOperation23 Turning the Heater On and OffNormal Operating Sounds Optional Blower Adjusting the Speed24Operation Normal Operating OdorsCleaning Your Heater Maintenance25Yearly Service Procedure 26Maintenance Troubleshooting StepsWhat Turns the Main Burners On and Off Maintenance27How this Heater Works What Prevents Gas BuildupWiring Diagram 28MaintenanceReplacement Parts 2000 2001 2002 Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Safety LabelMinimum Clearances to Combustibles Dec.0398Years 3 Through 5 Coverage Parts & Labor Limited 7 Year WarrantyYears 1 & 2 Coverage Parts & Labor Years 6 & 7 Coverage Parts onlyOptional Equipment LP Conversion InstructionsFrom the air shutter by 32Optional EquipmentPlace Nutdriver Sliding it to the leftOff the pilot 34Optional Equipment FirebackBlower Back Stove36Optional Equipment Gold Grill Before installing the ventGold Door Gold Trivet38Installation Addenda Addendum #1 Class a Chimney Conversion KitInterior Masonry Chimney Installation AddendaAddendum #2 Interior Masonry Chimney Conversions Standard Masonry Fireplace40Index