Avalon Stoves Cedar EF manual 38Installation Addenda, Addendum #1 Class a Chimney Conversion Kit

Page 40

38Installation Addenda

ADDENDUM #1 Class A Chimney Conversion Kit

Simpson Duravent provides a conversion kit for those wishing to use an existing wood stove chimney to vent this direct vent stove. The illustration below gives an overview of this type of installation. See the instructions included with the kit for details.

!

Do not exceed the maximum vertical rise (see the

 

section "Approved Vent Configurations" starting on

 

page 9) allowable. Remember to set the restrictor

 

position to the correct position (based upon the

 

vertical rise height - see the chart on page 10).

!

The conversion kit does not work on interior

 

masonry chimneys.

 

Chimney Conversion Kit A (# 931)

 

Metalbestos 6" I.D.

 

Security Chimneys 6" I.D.

Screw the Retro Vertical Top to the Flex Pipe

Retro Vertical Top (screw to chimney)

Cut the Flex Pipe to the chimney height plus 3" (75 mm)

Jackes-Evans 6" I.D.

Hart & Cooley 6" I.D.

Pro-Jet 6" I.D.

Chimney Conversion Kit B (# 932)

Simpson Dura-Vent 6" I.D.

Air-Jet 6" I.D.

Metal-Fab 6" and 7" I.D.

Amer. Metals 6" & 7" I.D.

Metalbestos 7" and 8" I.D.

Jackes-Evans 7" and 8" I.D.

Hart & Cooley 7" and 8" I.D.

Pro-Jet 7" and 8" I.D.

Security Chimneys 8" I.D.

Chimney Conversion Kit C (# 933)

Simpson Dura-Vent 7" and 8" I.D.

American Metals 8" I.D.

Air-Jet 8" I.D.

Metal-Fab 8" I.D.

American Metals 8" I.D.

Each Kit Contains:

Retro Connector

Retro Vertical Top

Additional Required Equipment:

4" Flex (#711 or U.L. 1777)

Termination (#991)

Co-Axial Sections

Type A Chimney

4" (100 mm)

Aluminum Flex

Pipe

Retro Connector (screw to chimney)

Simpson Duravent Direct Vent Pipe Sections (use adjustable section)

Screw the Retro Connector to the Flex Pipe

Travis Industries

4 1 2 2 1 0 4

9 3 5 0 8 1 1 7

Image 40 Contents
Cedar Manual Page Introduction Important Information Introduction1Travis Industries 2 2 1 0 5 0 8 1 1 Safety Precautions This Manual Table of Contents Specifications5 Installation Warnings Installation PreparationPacking List Stove ClearancesHeater Placement Requirements Gas Line InstallationFloor Protection Requirements Gas Inlet PressureVent Requirements Manuafacturer R i e sApproved Vent Configurations Restrictor PositionMeasuring Vent Lengths T EVertical Terminations with 0, 2, or 4 45 Offsets Offset Length Hor. Offset Vert. RiseRestrictor Position #Horizontal Terminations with One 90 Elbow Restrictor Restrictor Position # Vertical Terminations with Two 90 Elbows 5feet 10feet 15feet 20feet Restrictor Position #Position Rise every 12 of travelTermination Requirements see the illustration below Finalizing the Installation Correct Opening the Door Log Set and Coal Installation Safety Notice Operation21Location Gas Control Valve22Operation Starting The Pilot FlameAdjusting the Flame Height Operation23Starting the Heater for the First Time Turning the Heater On and OffOptional Blower Adjusting the Speed 24OperationNormal Operating Sounds Normal Operating OdorsCleaning Your Heater Maintenance25Yearly Service Procedure 26Maintenance Troubleshooting StepsMaintenance27 How this Heater WorksWhat Turns the Main Burners On and Off What Prevents Gas BuildupWiring Diagram 28MaintenanceReplacement Parts Safety Label Minimum Clearances to Combustibles2000 2001 2002 Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec.0398Limited 7 Year Warranty Years 1 & 2 Coverage Parts & LaborYears 3 Through 5 Coverage Parts & Labor Years 6 & 7 Coverage Parts onlyOptional Equipment LP Conversion Instructions32Optional Equipment Place NutdriverFrom the air shutter by Sliding it to the leftOff the pilot 34Optional Equipment FirebackBlower Back Stove36Optional Equipment Before installing the vent Gold DoorGold Grill Gold Trivet38Installation Addenda Addendum #1 Class a Chimney Conversion KitInstallation Addenda Addendum #2 Interior Masonry Chimney ConversionsInterior Masonry Chimney Standard Masonry Fireplace40Index