Avalon Stoves Cedar EF manual Restrictor

Page 14

12 Installation (for qualified installers only)

Approved Venting Configurations with a Horizontal Termination and Two Elbows (one 90° vertical and one 90° or 45° horizontal elbow)

If using a Snorkel Termination (14” or 36”) add the snorkel height to the vertical height (snorkel terminations are used primarily for basement installations).

The termination must fall within the shaded area shown in the chart. Use the indicated restrictor position.

19' (max)

15feet

10' (min)

5 feet

0feet

5feet

10feet

15feet

20feet

24'(max)

Restrictor

Position # 5

 

 

 

NOTE:

 

 

 

Restrictor positions are based upon lab

 

 

 

tests. The ideal restrictor position may vary

 

 

 

 

 

 

slightly, especially when the termination is

 

 

Restrictor

 

 

Position # 1

near a demarkation line.

 

 

 

 

 

 

 

 

 

 

 

 

NOTE:

Horizontal sections require a 1/4" rise every 12" of travel.

NATURAL GAS: Min. 2' Section Required

PROPANE (LP): Min. 3' Section Required

19' (max)

15feet

10' (min)

5 feet

0 feet

0 feet

0 feet

5feet

10feet

15feet

20feet

'(max)

 

 

 

 

24

H2

This is considered a horizontal elbow (it does not matter whether it turns right or left).

It may be a 90° or 45° elbow.

Horizontal length (max. 24') is calculated by adding both lengths of horizontal run (Horizontal Length = H1 + H2).

H1

This is considered a

 

 

vertical elbows

Travis Industries

4 1 2 2 1 0 4

9 3 5 0 8 1 1 7

Image 14 Contents
Cedar Manual Page Travis Industries 2 2 1 0 5 0 8 1 1 Introduction1Introduction Important Information Safety Precautions This Manual Table of Contents Specifications5 Packing List Installation WarningsInstallation Preparation Stove ClearancesFloor Protection Requirements Heater Placement RequirementsGas Line Installation Gas Inlet PressureVent Requirements Manuafacturer R i e sMeasuring Vent Lengths Approved Vent ConfigurationsRestrictor Position T ERestrictor Vertical Terminations with 0, 2, or 4 45 OffsetsOffset Length Hor. Offset Vert. Rise Position #Horizontal Terminations with One 90 Elbow Restrictor Restrictor Position # Vertical Terminations with Two 90 Elbows 5feet 10feet 15feet 20feet Restrictor Position #Position Rise every 12 of travelTermination Requirements see the illustration below Finalizing the Installation Correct Opening the Door Log Set and Coal Installation Location Safety NoticeOperation21 Gas Control Valve22Operation Starting The Pilot FlameStarting the Heater for the First Time Adjusting the Flame HeightOperation23 Turning the Heater On and OffNormal Operating Sounds Optional Blower Adjusting the Speed24Operation Normal Operating OdorsYearly Service Procedure Maintenance25Cleaning Your Heater 26Maintenance Troubleshooting StepsWhat Turns the Main Burners On and Off Maintenance27How this Heater Works What Prevents Gas BuildupReplacement Parts 28MaintenanceWiring Diagram 2000 2001 2002 Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Safety LabelMinimum Clearances to Combustibles Dec.0398Years 3 Through 5 Coverage Parts & Labor Limited 7 Year WarrantyYears 1 & 2 Coverage Parts & Labor Years 6 & 7 Coverage Parts onlyOptional Equipment LP Conversion InstructionsFrom the air shutter by 32Optional EquipmentPlace Nutdriver Sliding it to the leftOff the pilot 34Optional Equipment FirebackBlower Back Stove36Optional Equipment Gold Grill Before installing the ventGold Door Gold Trivet38Installation Addenda Addendum #1 Class a Chimney Conversion KitInterior Masonry Chimney Installation AddendaAddendum #2 Interior Masonry Chimney Conversions Standard Masonry Fireplace40Index