Avalon Stoves Cedar EF manual Blower, Back Stove

Page 37

Optional Equipment

35

Blower (part # 99000153)

WARNING: Turn the gas control valve to off and make sure the appliance has fully cooled prior to conducting service.

1.Attach the two black wires at the rear right of the stove to the thermodisk (orientation does not matter). Then slide the thermodisk into the holder underneath the burner pan.

of Back Stove

Snap Disk Bracket (attached to stove)

Snap Disk

Snap Disk Wires on Wiring Harness (Black - orientation does not matter)

2.Place the blower near the rear of the stove. Attach the wiring in grommets following the directions below.

of Back Stove

f

Route the wires labeled “Valve on/off” and “Solenoid” under the burner pan to a location

near the gas control valve. e Attach the two wires leading

from the control box to the two block wires labeled “Rheostat”.

Remove one of the screws holding

a

the mounting bracket in place. Insert the screw through the eyelet on the green ground wire and replace.

1/4" Nutdriver

b Attach the black and white wires labeled “Blower” to the blower

(orientation does not matter).

c Attach the molex connector.

d Slide the rubber grommets (with

DO NOT PLUG THE STOVE

IN UNTIL INSTALLATION IS

spacers inserted inside) onto the

 

fan mounting bracket.

COMPLETE.

 

Travis Industries

4 1 2 2 1 0 4

9 3 5 0 8 1 1 7

Image 37 Contents
Cedar Manual Page Introduction Important Information Introduction1Travis Industries 2 2 1 0 5 0 8 1 1 Safety Precautions This Manual Table of Contents Specifications5 Installation Preparation Installation WarningsPacking List Stove ClearancesGas Line Installation Heater Placement RequirementsFloor Protection Requirements Gas Inlet PressureManuafacturer R i e s Vent RequirementsRestrictor Position Approved Vent ConfigurationsMeasuring Vent Lengths T EOffset Length Hor. Offset Vert. Rise Vertical Terminations with 0, 2, or 4 45 OffsetsRestrictor Position #Horizontal Terminations with One 90 Elbow Restrictor Restrictor Position # 5feet 10feet 15feet 20feet Restrictor Position # Vertical Terminations with Two 90 ElbowsRise every 12 of travel PositionTermination Requirements see the illustration below Finalizing the Installation Correct Opening the Door Log Set and Coal Installation Operation21 Safety NoticeLocation Gas Control ValveStarting The Pilot Flame 22OperationOperation23 Adjusting the Flame HeightStarting the Heater for the First Time Turning the Heater On and Off24Operation Optional Blower Adjusting the SpeedNormal Operating Sounds Normal Operating OdorsCleaning Your Heater Maintenance25Yearly Service Procedure Troubleshooting Steps 26MaintenanceHow this Heater Works Maintenance27What Turns the Main Burners On and Off What Prevents Gas BuildupWiring Diagram 28MaintenanceReplacement Parts Minimum Clearances to Combustibles Safety Label2000 2001 2002 Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec.0398Years 1 & 2 Coverage Parts & Labor Limited 7 Year WarrantyYears 3 Through 5 Coverage Parts & Labor Years 6 & 7 Coverage Parts onlyLP Conversion Instructions Optional EquipmentPlace Nutdriver 32Optional EquipmentFrom the air shutter by Sliding it to the leftOff the pilot Fireback 34Optional EquipmentBack Stove Blower36Optional Equipment Gold Door Before installing the ventGold Grill Gold TrivetAddendum #1 Class a Chimney Conversion Kit 38Installation AddendaAddendum #2 Interior Masonry Chimney Conversions Installation AddendaInterior Masonry Chimney Standard Masonry Fireplace40Index