GE 255 operation manual C8 Regenerant Refill Quick cycle to Service

Page 21

2. Press and hold the button for 5 seconds. This will start the second regeneration.

Quick cycle as Tank 2 moves through cycles: C5 - Fast Rinse

C6 - 2nd Backwash

C7 - 2nd Rinse

C8 - Regenerant Refill; the aircheck is filled and flow to the regenerant tank is visable.

Quick cycle to Service then--

Quick cycle as Tank 1 moves through cycles: C1 - Backwash

C2 - Regenerant Draw; the regenerant tank should have water in it. As the draw occurs the level will go down.

C3 - Slow Rinse

C4 - Standby

At this point Tank 1 is fully operational.

3. Press and hold the button for 5 seconds. This will start the third regeneration. After this step both tanks will be ready.

Quick cycle as Tank 1 moves through cycles: C5 - Fast Rinse

C6 - 2nd Backwash

C7 - 2nd Rinse

C8 - Regenerant Refill Quick cycle to Service

then--

Quick cycle as Tank 2 moves through cycles: C1 - Backwash

C2 - Regenerant Draw; the regenerant tank should have water in it. As the draw occurs the level will go down.

C3 - Slow Rinse

C4 - Standby

Both tanks are now ready.

4.Turn on a faucet plumbed after the water conditioner. Run the faucet until the water runs clear.

5.Add water to the regenerant tanks.

A.With a bucket or hose, add water until approximately 4 gallons (15 liters) of water in each regenerant tank.

B.If the tank has a salt platform in the bottom of the tank, add water until the water level is approximately 1 inch (25 mm) above the platform.

The Alternating Water Conditioning System is Now Fully Operational

Note: After any control reset (valve type or system change, etc.) it is necessary to initiate a manual regeneration and quick cycle through it. This will ensure the control and cam are synchronized. If not synchronized err# will display and the control will drive cams to the correct position for valve and system type programmed..

21

Image 21
Contents Lockout ModelsPage Table of Contents Safety Information How To Use This Manual FrontBack Outdoor Locations Location SelectionUnconditioned water Conditioned water out Installation Location SelectionWater Line Connection Drain Line Connection Brine Line ConnectionBrine Tank Overflow Line Connection Electrical Connection Brine TankVAC AC Adapters Disinfection of Water Conditioning Systems System Operation Camshaft Cycle Positions Power Loss Memory RetentionValve Disc Location/Function Control OperationX100 Display Icons & CursorsProgramming Conventions Keypad ButtonsPlacing Water Conditioning System Into Operation Power-up the ControlRemove air from tanks Preprogrammed Valves TypeMetric Resin Volume 0.25 ft3 and 5 Liter Steps Screen Buttons to Description Quick Cycling the Control 255L and 255P Fully Operational Quick Cycling the Control for 255A SystemsTo Place the 255 Alternating System into Operation C8 Regenerant Refill Quick cycle to Service Programming Overview Service DisplayLevel I Programming Logix 764 Electronic Multi-Tank a Alternating ControlLevel II Programming P Values Description Range Minimum Default UnitsSalt Setting Programming the Lockout FeatureSalt Setting Exchange Capacity 255 ValveLevel lll Cycle Programming C Values Description Range Minimum DefaultProgram Reset Level IV Viewing History H ValuesHistory Data Description Range Delayed Second Regeneration Delayed Manual RegenerationManual Regeneration Options Immediate Manual RegenerationP16 = Priority Flow Continuous Efficiency Regeneration Modes for Parallel SystemsHigh Ave Low P16 = High Ave LowRemote Regeneration Start Wiring DiagramsConnecting the Logix 764 Multi Single Tank Control Exploded View & Parts List Parts ListsNumber Description QtyBypass Valve and Turbine Adapter BypassTurbine Adapter Part Description Qty Manifold Kits Controller Error Codes & 255 L with Check Salt Light TroubleshootingProblem Possible Cause Solution System TroubleshootingReset control and program resin volume Page Page Copyright 2007 General Electric Company P/N 3019624 Rev a