GE Placing Water Conditioning System Into Operation, Quick Cycling the Control 255L and 255P

Page 19

Placing Water Conditioning System Into Operation (continued)

Caution: If your system is a 255A (Alternating) go to “Quick Cyling the Control for 255A Systems”.

Quick Cycling the Control 255L and 255P

It is required that the control be quick cycled to specific regeneration cycles when placing the conditioner into operation. This will ensure that all of the air in the tank and valve is purged. The process also provides a check for leaks and functioning of the brine system. Please perform the following steps for quick cycling the control, before proceeding to start-up.

1.With the control in the treated water position, Press and hold the REGEN button on the controller for 5 seconds. This will initiate a manual regeneration. The control will display a solid hourglass indicating that the motor and camshaft are turning to the backwash cycle (C1). When the control reaches the backwash cycle, the total regeneration time remaining will be displayed. Pressing the SET button will display the specific cycle time remaining.

2.Press and release the UP and SET buttons to move the control to the Regenerant Draw cycle (C2).

3.Repeat Step 2 to advance to each cycle.

Before the final filling of the media tank with water check that:

the nearest water faucet is completely closed.

the valve drain line is properly routed to a drain

the regenerant tank is empty and the regenerant hose is connected to the valve

the water supply valve is off.

Note: The control can be sent directly back to the treated water position from any regeneration cycle. Press the UP and SET buttons (about 5 seconds) until the hourglass icon begins flashing. The control will now skip all remaining regeneration cycles.

255 Alternating and parallel tank systems have one Logix 764 control that is mounted on tank 1. Tank 2 has a blank faceplate and the valve is controlled by the Logix 764 control on tank 1.

4.Add water to the regenerant tank.

A.With a bucket or hose add approximately 4 gallons (15 liters) of water to the regenerant tank.

B.If the tank has a salt platform in the bottom of the tank, add water until the water level is approximately 1 inch (25 mm) above the platform.

Note: It’s recommended that you do not put regenerant into the tank until after the control valve has been put into operation. With no regenerant in the tank, it is much easier to view water flow and motion in the tank.

5. Press and hold the button on the controller for 5 seconds. This will initiate a manual regeneration.

The control will display a solid hourglass indicating that the motor and camshaft are turning to the backwash cycle (C1). When the control reaches the backwash cycle, the total regeneration time remaining will be displayed. Pressing the SET button will display the specific cycle time remaining.

6.While the controller is in cycle C1 (Backwash), open the water supply valve very slowly to approximately the ¼ open position. Water will begin to enter the media tank. Any air remaining will begin to be purged to drain as the media tank fills with water.

WARNING: If opened too rapidly or too far, media may be lost out of the tank into the valve or the plumbing. In the ¼ open position, you should hear air slowly escaping from the valve drain line.

When all of the air has been purged from the media tank (water begins to flow steadily from the drain line), open the main supply valve all of the way. This will purge the final air from the tank.

Allow water to run to drain until the water runs clear from the drain line. This purges any debris from the media bed.

7.Check Regenerant Draw.

A.Quick cycle the control to the C2 regenerant draw/slow rinse position .

Note: As you advance through each cycle there will be a slight delay before you can advance to the next cycle. There will be a pause after the regenerant draw and slow rinse cycles. This cycle (C4) is a repressurization cycle and is designed to allow the water pressure to equalize on each side of the valve discs. Allow the control to repressurize (3 minutes) before cycling the control to the regenerant tank refill position.

B.C2 will be displayed. With the control in this position, check to see that the water is being drawn out of the regenerant tank. The water level in the regenerant tank should recede very slowly.

19

Image 19
Contents Lockout ModelsPage Table of Contents Safety Information Front How To Use This ManualBack Outdoor Locations Location SelectionUnconditioned water Conditioned water out Location Selection InstallationWater Line Connection Brine Line Connection Drain Line ConnectionBrine Tank Overflow Line Connection Brine Tank Electrical ConnectionVAC AC Adapters Disinfection of Water Conditioning Systems System Operation Control Operation Power Loss Memory RetentionCamshaft Cycle Positions Valve Disc Location/FunctionX100 Display Icons & CursorsProgramming Conventions Keypad ButtonsPreprogrammed Valves Type Power-up the ControlPlacing Water Conditioning System Into Operation Remove air from tanksMetric Resin Volume 0.25 ft3 and 5 Liter StepsScreen Buttons to Description Quick Cycling the Control 255L and 255P Quick Cycling the Control for 255A Systems Fully OperationalTo Place the 255 Alternating System into Operation C8 Regenerant Refill Quick cycle to Service Logix 764 Electronic Multi-Tank a Alternating Control Service DisplayProgramming Overview Level I ProgrammingLevel II Programming P Values Description Range Minimum Default UnitsExchange Capacity 255 Valve Programming the Lockout FeatureSalt Setting Salt SettingLevel lll Cycle Programming C Values Description Range Minimum DefaultLevel IV Viewing History H Values Program ResetHistory Data Description Range Immediate Manual Regeneration Delayed Manual RegenerationDelayed Second Regeneration Manual Regeneration OptionsHigh Ave Low Regeneration Modes for Parallel SystemsP16 = Priority Flow Continuous Efficiency High Ave Low P16 =Remote Regeneration Start Wiring DiagramsConnecting the Logix 764 Multi Single Tank Control Exploded View & Parts List Parts ListsNumber Description QtyBypass Bypass Valve and Turbine AdapterTurbine Adapter Part Description Qty Manifold Kits Controller Error Codes & 255 L with Check Salt Light TroubleshootingProblem Possible Cause Solution System TroubleshootingReset control and program resin volume Page Page Copyright 2007 General Electric Company P/N 3019624 Rev a

255 specifications

The GE 255 is a versatile and powerful gas turbine, known for its exceptional efficiency and reliability in various industrial applications. As one of the flagship models from General Electric, the GE 255 has garnered attention for its performance, design, and technological advancements.

One of the main features of the GE 255 is its advanced aerodynamics. The turbine incorporates cutting-edge blade designs that enhance airflow and optimize combustion efficiency. These aerodynamic improvements contribute to increased power output, allowing the turbine to generate more energy while consuming less fuel. The efficiency of the GE 255 makes it an attractive option for power plants looking to reduce operational costs while maintaining high output levels.

In addition to its aerodynamic features, the GE 255 is equipped with sophisticated combustion technology. This technology enables the turbine to achieve low emissions, adhering to strict environmental regulations. The combustion system is designed to provide stable and reliable operation across various load conditions, ensuring that power generation remains consistent even in fluctuating demand scenarios.

The GE 255 also boasts a modular design, allowing for easier maintenance and upgrades. The components are designed with serviceability in mind, ensuring that downtime is minimized during routine inspections or repairs. This modular approach not only enhances the overall lifespan of the turbine but also allows operators to implement technology upgrades as they become available, ensuring that the equipment remains state-of-the-art.

Moreover, the GE 255 integrates advanced monitoring and control systems that provide real-time data on performance and operational health. These systems enable operators to make informed decisions, optimizing performance and identifying potential issues before they escalate. The data collected can be analyzed to improve operational practices and reduce maintenance costs.

The turbine's robust construction also contributes to its reliability. Built to withstand harsh operating conditions, the GE 255 includes features that protect critical components from wear and degradation. This durability extends the operational life of the turbine and enhances its overall availability for power generation.

In summary, the GE 255 is a state-of-the-art gas turbine distinguished by its advanced aerodynamics, low emissions combustion technology, modular design, and robust monitoring systems. It represents a blend of efficiency and reliability, making it a leading choice for energy providers aiming to maximize output while minimizing environmental impact. Its combination of innovative features positions the GE 255 as a significant player in the competitive landscape of gas turbines.