Bosch Appliances BC2600RA installation manual Condensate Piping

Page 12

Installation Instructions

9.Condensate Piping

PLEASE FOLLOW LOCAL CODES ABOUT CONDENSATE PIPING.

This water heater is a high efficiency, fully condensing appliance which produces condensate during operation. Therefore, it is necessary to install condensate piping. The water heater incorporates a col- lection, neutralization, and removal system which must be properly drained in order to ensure proper operation of this appliance.

The water heater is supplied with a pre-installed condensate neutralization system. No additional neu- tralizer is required unless local code dictates otherwise.

In order to drain the condensate, a 15mm (1/2" BSP) male thread fitting is provided at the base of the water heater.

DO NOT FIT ANY VALVES OR REDUCE THE SIZE OF THIS FITTING OR THE CONDENSATE PIPING TO LESS THAN 15mm (1/2" BSP).

Use plastic pipe, such as PVC, for the drain line. Do not use steel, black iron, or any other material which can corrode when placed into contact with water.

Keep the length of the drain pipe as short as possible.

Horizontal runs must be sloped 1/50 downwards the drain.

The end of the drain pipe must not be submerged in water or blocked in any way.

Be sure to check that condensate is freely flowing from the drain piping after the system has been installed. Condensate will begin flowing out of the water heater within 15 minutes after operation has started.

Take measures to prevent the condensate drain lines from freezing (insulation, heat tape, electric heat- ers, etc.).

Condensate piping to floor drain

DO NOT FIT

ANY VALVES

Slope pipe downwards 1/50.

Floor drain

1/2" PVC pipe

The end of the drain pipe must have an air gap.

KEEP CLEARANCE

12

Image 12
Contents Installation Manual Installation Manual Included Accessories Before Installation Use Extreme Caution if Using With a Solar Pre-HeaterCheck the Gas Check Water Supply QualityChoosing Installation Site IndoorInstallation Clearances Before installing, check for the followingClearances for Flue Terminal front of heater Installation Securing to the wallGas Piping Gas PressureGas Meter Measuring Gas Pressure Gas ConnectionWater Piping Supply water piping Drain processingHot water piping Condensate Piping Electrical Wiring EarthYPRM67XB Connecting Remote Controller Cord to Unit Maintenance Handling after trial operationLighting Instructions Dimensions 338