SERVICE PROCEDURE PDV24-V
Main Burner & Pilot
Removal and Inspection
WARNING
Water Heater components may be HOT when performing the following steps in this
procedure. Take necessary precaution to prevent personal injury.
PDV (S&T) MODELS |
|
|
|
| (Hinged Door) |
Step 1: Remove burner box cover screws | Step 2: Open Burner Box Cover |
Step 3: Disconnect Pilot Fitting from Burner Box
Step 4: Disconnect gas valve wires and pilot tube
Step 5: Disconnect and Remove Gas | Step 6: Remove pipe flange plate from |
Valve | Burner Box |
35