American Water Heater (A)BCG3 85T500-8N, (A)BCG3 85T500-8P instruction manual Chemical Hazard

Page 29

Chemical Hazard

• Product contains phosphoric acid.

• Keep out of reach of children.

• Use rubber or neoprene gloves.

UN•LIME contains phosphoric acid. In case of external contact, flush with cool water. If irritation persists, get medical attention. If swallowed, give 1 or 2 glasses of water or milk and call physician.

Get immediate medical attention for contact with eyes. Keep out of reach of children.

NOTE: THE USE OF RUBBER OR NEOPRENE GLOVES IS RECOMMENDED, ESPECIALLY IF YOU HAVE ANY OPEN SORES OR CUTS TO AVOID UNNECESSARY IRRITATION OR DISCOMFORT.

1.Turn off fuel and/or power supply to heater. Also, turn off power to any electrical device or equipment, which is attached, or part of the system.

2.Open hot water side of faucet closest to heater and allow water to run until it is cool enough to handle safely.

3.Close cold water inlet valve to heater.

4.Connect hose to drain valve at bottom of heater and start draining heater into suitable floor drain area.

5.Remove relief valve while heater is draining. NOTE: Do not replace relief valve until deliming is completed. Relief valve opening will also act as a vent in case of possible contact between the delimer and the anode rod(s), which may produce flammable hydrogen-air mixtures.

6.If relief valve appears to be limed-up, place it in a clean glass or plastic container adequate in size so that you can pour enough UN•LIME® into the container to cover the valve and allow space for foaming. When foaming stops, run fresh cool water into the container and rinse the relief valve for a few minutes.

7.If heater does not drain completely after a reasonable length of time, turn off the main water supply valve to stop water from entering the tank due to a by-pass problem or defective cold water inlet valve. Also, check for clogged drain valve opening. Heater must be completely drained before introducing UN•LIME.

8.Remove the cleanout cover and place a clean plastic bucket next to the cleanout opening.

Partially open the cold water inlet valve to allow time to accomplish the following and then close the valve.

While the water is being run through the tank, insert a stiff wire, copper tube flattened at one end or an opened wire coat hanger through the cleanout opening and scrape out any loose deposits of scale or sediment. This is an economical way to avoid unnecessary usage of the deliming solution.

Repeat the opening and closing of the cold water inlet valve as necessary but be sure the heater is completely drained when ready to introduce the UN•LIME.

Upon completion, reinstall the cleanout cover and use a new cleanout cover gasket (part number 9004099215).

Remove the drain valve.

9.Install the long plastic male adapter insert fitting into the drain valve opening of heater after applying Teflon tape or paste to threads. Tighten firmly by hand and use wrench or adjustable pliers to check for secure connection. Do not over tighten to avoid damage to threads and fittings.

Prepare the Up-N-Down Transfer Kit

The next step is the preparation of the Up-N-Down Transfer Kit, if you have not already done so:

1.With the 5 gallon Up-N-Down container in the vertical position, unscrew the plastic vent cap in the handle and pierce the plastic membrane over the vent boss under the cap to allow the container to vent.

Note: If your container does not have the vent cap and vent boss, drill a 3/16” hole in the handle. When you have finished deliming you will be able to plug this drilled vent with the stainless steel screw that is supplied with the kit.

2.Remove the container’s cap and cut the plastic membrane located in the 3/4” IPT opening in the cap. Take care to not damage the threads.

3.Find the 3/4” male adapter, apply teflon tape to the threaded end and screw it into the 3/4” IPT opening in the cap.

4.Put cap with male adapter back on the container and slide 3/4” hose over end of male adapter and fasten in place using hose clamp provided.

Delime using Flo-Jug Method

5.Slide the hose clamp over end of hose and slide hose over the male adapter in the water heater drain opening and secure in place using hose clamp.

6.Lift container to the “Pour” Position, see Figure 28, being careful to keep the vent in the handle above the liquid level and pour the UN•LIME into the heater.

7.Lower container, you may have to place the container on its empty carton to prevent the UN•LIME from flowing back into the container.

8.Let UN•LIME remain in the heater for 5 minutes and then lower the container to the “Drain” Position, see Figure 28.

9.Deliming activity is indicated by foaming on the surface of the UN•LIME. If there is deliming activity, repeat steps 6 thru 8.

Normally, lime removal will be completed within one hour. Severe build-up of lime may take longer than an hour to complete descaling.

Note: To check UN•LIME for continued use, place some scale or white chalk in a glass with a small amount of UN•LIME. If the material is vigorously dissolved by the UN•LIME, it can be reused; if not, the UN•LIME should be replaced.

FIGURE 28.

29

Image 29
Contents Commercial gas water heaters Table Of Contents Asme CRN Safe Installation, Use and ServiceFire and Explosion Hazard General Safety InformationHydrogen Gas Flammable PrecautionsGrounding Instructions Qualifications IntroductionAbbreviations Used Features and components 2 NPT Installation considerationsRough In Dimensions Model Right Left Back Ceiling Side Locating the Water HeaterClearances Insulation Blanket Installation On Combustible FlooringHard Water Circulation PumpsNatural Gas Installations Propane InstallationsHigh Altitude Installations Power Supply Installation RequirementsWater Temperature Controland Mixing Valves Gas Pressure RequirementsDishwashing Machines Temperature-Pressure Relief ValveClosed Water Systems Thermal ExpansionAir Requirements Contaminated AirUnconfined Space VENTING InstallationConfined Space Vent AdapterFresh Air Openings For Confined Spaces Multiple Heater ManifoldOutdoor Air Through Two Openings Outdoor Air Through One OpeningAir From Other Indoor Spaces Outdoor Air Through Two Vertical DuctsMultiple Gas Fired Tank-Type Heaters Technical Data VentingValve Discharge Pipe Water heater installationWater Line Connections Code Restrictions Installation Diagrams Top Inlet/Outlet UsageHeater Wiring Purging Gas PipingGas Pressure Regulator GAS Supply Pipe Length FeetFilling AdjustmentsGeneral Lighting & Operation Label For Your Safety Read Before OperatingIgniter Assembly Check the Igniter AssemblyCheck Venting Main BurnerRemote Storage Tank Temperature Control MAINTENANCETemperature-Pressure Relief Valve Test Checking the InputAnode Rod Inspection Hot Water OdorDraining and Flushing To Drain the Water Heater Storage TankDeliming Solvents Tank Cleanout ProcedureDeliming Using Flo-Jug Method Chemical Hazard For your information AIR in HOT Water Faucets High Water Temperature Shut OFF SystemSequence of Operation Flow Chart Complaint Cause Remedy User Service Agent Operational checklistWater Piping DiagramsTemperature & Pressure Temperature & Pressure Relief Valve Circulating Pump Multi Flue 2 Units Multi Flue 2 Units with Vertical Storage Tank Multi Flue 2 Units with Vertical Storage Tank Return from Multi Flue 2 Units TWO Temperature Multi Flue 2 Units with Booster TWO Temperature MULTI-FLUE 3 Units MULTI-FLUE 3 Units with Vertical Storage Tank MULTI-FLUE 3 Units with Horizontal Storage Tank Multi Flue Flue 4 Units MULTI-FLUE 4 Units with Vertical Storage Tank MULTI-FLUE 4 Units with Horizontal Storage Tank Manifold Kits For Technical ASSISTANCE, Service or Warranty Information

(A)BCG3 85T500-8N, (A)BCG3 85T500-8P specifications

American Water Heater has long been a trusted name in the industry, providing high-quality solutions for residential and commercial water heating needs. Among its impressive lineup of products, the (A)BCG3 85T500-8P and (A)BCG3 85T500-8N models stand out due to their outstanding efficiency, performance, and innovative technologies.

These water heaters are primarily classified as high-efficiency gas water heaters, designed to meet a variety of usage demands. With a robust design and advanced technological features, they cater to homes and businesses that require reliable and energy-efficient hot water solutions.

One of the most notable features of the (A)BCG3 85T500-8P and (A)BCG3 85T500-8N models is their remarkable thermal efficiency. They are engineered to optimize energy usage, which not only helps reduce utility bills but also minimizes environmental impacts. This energy efficiency is achieved through advanced insulation and heat exchange technologies that maintain water temperature with minimal energy expenditure.

Both models come equipped with a powerful gas burner that allows for rapid heating, making them ideal for high-demand scenarios. The innovative burner technology ensures even heat distribution, significantly reducing recovery time and ensuring that hot water is available whenever needed.

In terms of safety, American Water Heater has incorporated several features to protect users and the unit itself. These include safety shut-off valves and temperature control features that prevent overheating and provide peace of mind.

Durability is another hallmark of these models. Constructed with high-quality materials, they resist the wear and tear commonly associated with traditional water heaters. Furthermore, the design of the (A)BCG3 85T500-8P and (A)BCG3 85T500-8N emphasizes ease of maintenance, allowing for simpler servicing and reduced downtime.

Finally, both models are backed by American Water Heater's commitment to customer satisfaction, supported by comprehensive warranties and reliable customer service. This assurance adds value to their products, making them a preferred choice for consumers seeking efficient and dependable water heating solutions.

In conclusion, the (A)BCG3 85T500-8P and (A)BCG3 85T500-8N models exemplify American Water Heater’s dedication to innovation and efficiency, making them excellent options for anyone in need of advanced water heating technology.