American Water Heater (A)BCG3 85T500-8P MULTI-FLUE 4 Units with Horizontal Storage Tank

Page 48

LEGEND

MULTI-FLUE (4 UNITS) WITH HORIZONTAL STORAGE TANK

WARNING: THIS DRAWING SHOWS SUGGESTED

PIPING CONFIGURATION AND OTHER DEVICES;

CHECK WITH LOCAL CODES AND ORDINANCES

FOR ADDITIONAL REQUIREMENTS.

TEMPERATURE & PRESSURE RELIEF VALVE

PRESSURE RELIEF VALVE

CIRCULATING PUMP

TANK TEMPERATURE CONTROL

DRAIN

FULL PORT BALL VALVE

CHECK VALVE

TEMPERATURE GAGE

WATER FLOW SWITCH

 

PIPE T&P TO

PIPE T&P TO

PIPE T&P TO

 

OPEN DRAIN

OPEN DRAIN

OPEN DRAIN

48

 

 

 

HEATER

HEATER

HEATER

HEATER

PIPE T&P TO

 

 

 

OPEN DRAIN

 

 

 

FINISHED FLOOR

HOT WATER

PIPE T&P TO

TO FIXTURES

OPEN DRAIN

HOT WATER

RETURN

ALTERNATE LOCATION

STORAGE TANK

COLD WATER SUPPLY

EXPANSION TANK

NOTES:

1.Preferred piping diagram.

2.The temperature and pressure relief valve setting shall not exceed pressure rating of any component in the system.

3.Service valves are shown for servicing unit. However, local codes shall govern their usage.

4.The Tank Temperature Control should be wired to and control the pump between the water heater(s) and the storage tank(s).

5.The water heater’s operating thermostat should be set 5 degrees F higher than the Tank Temperature Control.

Image 48
Contents Commercial gas water heaters Table Of Contents Safe Installation, Use and Service Asme CRNGeneral Safety Information Fire and Explosion HazardPrecautions Grounding InstructionsHydrogen Gas Flammable Introduction Abbreviations UsedQualifications Features and components Installation considerations Rough In Dimensions2 NPT Locating the Water Heater ClearancesModel Right Left Back Ceiling Side Installation On Combustible Flooring Insulation BlanketHard Water Circulation PumpsPropane Installations High Altitude InstallationsNatural Gas Installations Installation Requirements Power SupplyWater Temperature Controland Mixing Valves Gas Pressure RequirementsTemperature-Pressure Relief Valve Dishwashing MachinesClosed Water Systems Thermal ExpansionContaminated Air Air RequirementsVENTING Installation Unconfined SpaceConfined Space Vent AdapterMultiple Heater Manifold Fresh Air Openings For Confined SpacesOutdoor Air Through Two Openings Outdoor Air Through One OpeningOutdoor Air Through Two Vertical Ducts Air From Other Indoor SpacesTechnical Data Venting Multiple Gas Fired Tank-Type HeatersWater heater installation Water Line ConnectionsValve Discharge Pipe Installation Diagrams Top Inlet/Outlet Usage Code RestrictionsHeater Wiring Gas Piping PurgingGas Pressure Regulator GAS Supply Pipe Length FeetAdjustments GeneralFilling For Your Safety Read Before Operating Lighting & Operation LabelCheck the Igniter Assembly Igniter AssemblyCheck Venting Main BurnerMAINTENANCE Remote Storage Tank Temperature ControlTemperature-Pressure Relief Valve Test Checking the InputHot Water Odor Anode Rod InspectionDraining and Flushing To Drain the Water Heater Storage TankTank Cleanout Procedure Deliming Using Flo-Jug MethodDeliming Solvents Chemical Hazard For your information High Water Temperature Shut OFF System AIR in HOT Water FaucetsSequence of Operation Flow Chart Operational checklist Complaint Cause Remedy User Service AgentDiagrams Water PipingTemperature & Pressure Temperature & Pressure Relief Valve Circulating Pump Multi Flue 2 Units Multi Flue 2 Units with Vertical Storage Tank Multi Flue 2 Units with Vertical Storage Tank Return from Multi Flue 2 Units TWO Temperature Multi Flue 2 Units with Booster TWO Temperature MULTI-FLUE 3 Units MULTI-FLUE 3 Units with Vertical Storage Tank MULTI-FLUE 3 Units with Horizontal Storage Tank Multi Flue Flue 4 Units MULTI-FLUE 4 Units with Vertical Storage Tank MULTI-FLUE 4 Units with Horizontal Storage Tank Manifold Kits For Technical ASSISTANCE, Service or Warranty Information