A.O. Smith BTI 100 G, BTI 85 G manual Contents General

Page 3

CONTENTS

PAGE

1.GENERAL

1.1

Description

4

1.2

Technical safety equipment

6

1.2.1

Gas control valve

6

1.2.2

Control panel

6

1.2.3

Operation of the storage water heater

7

1.2.4

Combustion products discharge safety device

7

1.3

Technical information

8

1.3.1

Dimensions

8

1.3.2

Technical data

10

2.FOR THE INSTALLER

2.1

Installation instructions

12

2.1.1

Installation

12

2.1.2

Water circulation system

13

2.1.3

Gas connection

15

2.1.4

Flue system

15

2.1.5

Flue down draught safety device

15

2.1.6

Electrical connection

15

2.2

Commissioning

16

2.2.1

Filling the water heater

16

2.2.2

Putting in to operation

16

2.2.3

Shut down

16

2.3

Removing and replacing the control panel front cover

17

2.4

Setting the gas pressure

17

2.5

Removing and replacing the inner door

18

2.6

Temperature regulation

18

2.7

Converting to another type of gas

19

2.8

Maintenance

19

2.8.1

Magenesium anode

19

2.8.2

Cleaning

20

2.8.3

Decalcification

20

2.8.4

Spare parts

20

2.9

Inlet combination

20

2.10

Gas smell

20

2.11

Condensation

20

3.FORTHEUSER

3.1

Commisioning

21

3.1.1

Filling the water heater

21

3.1.2

Putting into operation

21

3.1.3

Use

21

3.2

Fault overview

22

4.

WARRANTY

23

5.

Appendix 1

25

3

Image 3
Contents BTI 100 G BTI 85 GPage Contents General Description of the appliance GeneralPage Technical safety equipment Gas control valveControl panel Ignition failure Combustion products discharge safety deviceOperation of the storage water heater Normal operationBTI DimensionsDimensions Technical informationAOS Data Butane G30 30 mbar Technical dataUnit BTI Data Naturel GAS G20 20 mbarIonisation current Electrical connectionFor non-domestic applications Installation instructionsInstallation For domestic applicationsVented systems See figur Water circulation systemUnvented system See figur Electrical connection Gas connectionFlue system Draught diverterShut down CommissioningFilling the water heater Putting into operationReplacing the cover see figure Setting the gas pressureRemoving and replacing the control panel front cover Removing the cover see figureMounting the inner door Temperature regulationUnit BTI MaintenanceConverting to another type of gas Magenesium anodeInlet combination Gas smellCondensation 3 Use CommisioningFailure Possible Cause Corrective Action Fault overviewRange of guarantee Guarantee in generalGuarantee of the tank Conditions for installation and useClaims Appendix 1 Connection diagram BTI models Page Page 0308 253 R0