TABLE 8

APPROXIMATE TIME REQUIRED TO CONSUME

1 CU. FT. OF GAS AT FULL CAPACITY

 

 

 

TIME REQ’D

INPUT

TYPE

BTUH

TO CONSUME

RATE

OF

PER 1

CU. FT.

(BTUH)

GAS

CU. FT.

OFGAS

 

 

 

 

120,000

NATURAL

1050

31.5 SEC.

(35kW)

PROPANE

2500

75.0 SEC.

154,000

NATURAL

1050

24.5 SEC.

(45kW)

PROPANE

2500

58.4 SEC.

180,000

NATURAL

1050

21.1 SEC.

(53kW)

PROPANE

2500

50.3 SEC.

190,000

NATURAL

1050

19.9 SEC.

(56kW)

PROPANE

2500

47.4 SEC.

199,000

NATURAL

1050

19.0 SEC.

(58kW)

PROPANE

2500

47.4 SEC.

250,000

NATURAL

1050

15.1 SEC.

(73kW)

PROPANE

2500

35.3 SEC.

275,000

NATURAL

1050

13.75 SEC.

(81kW)

PROPANE

2500

32.2 SEC.

310,000

NATURAL

1050

12.4 SEC.

(91kW)

PROPANE

2500

29.5 SEC.

366,000

NATURAL

1050

10.4 SEC.

(107kW)

PROPANE

2500

24.7 SEC.

399,000

NATURAL

1050

9.5 SEC.

(117kW)

PROPANE

2500

22.6 SEC.

Figures shown are valid for 0-2000 ft. (0-610m) installations. See “HIGH ALTITUDE INSTALLATIONS” for deration requirement over 2000 ft. (610m).

OPERATION

IMPORTANT

A qualified person must perform the initial firing of the heater. At this time the user should not hesitate to ask the individual any questions which they may have in regard to the operation and maintenance of the unit.

An Operational Checklist is included at the rear of this manual. By using this checklist the user may be able to make minor operational adjustments and avoid unnecessary service calls. However, the user should not attempt repairs which are not listed under the USER column.

GENERAL

NEVER OPERATE THE HEATER WITHOUT FIRST BEING CERTAIN IT IS FILLED WITH WATER AND A TEMPERATURE AND PRESSURE RELIEF VALVE IS INSTALLED IN THE RELIEF VALVE OPENING OF THE HEATER.

SHOULD OVERHEATING OCCUR OR THE GAS SUPPLY FAIL TO SHUT OFF, TURN OFF THE MANUAL GAS CONTROL VALVE TO THE APPLIANCE.

CAUTION

Before proceeding with the operation of the unit make sure the water heater and system are filled with water and all air is expelled.

FILLING

1.Close the heater drain valve by turning handle clockwise.

2.Open a nearby hot water faucet to permit the air in the system to escape.

3.Fully open the cold water inlet pipe valve allowing the heater and piping to be filled.

4.Close the hot water faucet as water starts to flow.

5.The heater is ready to be operated.

WARNING

THE GAS VALVE MUST HAVE BEEN IN THE OFF POSITION FOR AT LEAST 5 MINUTES. This waiting period is an important safety step. Its purpose is to permit gas that may have accumulated in the combustion chamber to clear. IF YOU DETECT GAS ODOR AT THE END OF THIS PERIOD DO NOT PROCEED WITH LIGHTING. RECOGNIZE THAT GAS EVEN IF IT SEEMS WEAK, MAY INDICATE PRESENCE OF ACCUMULATED GAS SOMEPLACE IN THE AREA WITH RISK OF FIRE OR EXPLOSION. SEE THE FRONTPAGE FOR STEPS TO BE TAKEN.

All gas and water lines leak tested and open.

Read SEQUENCE OF OPERATION section of this manual prior to lighting and operating this appliance.

With above conditions satisfied, start the unit in accordance with the instructions on the Operating label attached to the heater. If label instructions are not legible - determine which gas valve the appliance is equipped with and use the applicable OPERATING INSTRUCTIONS as follows:

Each heater is equipped with an ignition control board. The controller will try three times to light the main burner before going into lockout. After the controller tries three times, it will wait one hour before trying to light the unit again. This cycle will continue until the main burners are ignited or the unit is shut down.

ADJUSTMENTS

ON INITIAL STARTUP SOMEADJUSTMENTS ARE NECESSARY.

1.CHECK MANIFOLD AND INLET GAS PRESSURES.

2.CYCLE CHECK - CHECK AT LEAST ONE BURNER OPERATION - WHEN THERMOSTAT IS SATISFIED, BURNER WILL SHUT OFF AND INDUCER WILL STOP RUNNING. ON CALL FOR HEAT - THE INDUCER WILL COME ON AND CLOSE THE PRESSURE SWITCH AND THE IGNITION SEQUENCE DESCRIBED ABOVE WILL BEGIN, SEE “SEQUENCE OF OPERATION”.

22

Image 22 Contents
Models BTI 120 Thru 400/A Commercial GAS, GLASS-LINED, TANK-TYPE Water HeaterFront View TOP View Back View ROUGH-IN-DIMENSIONS ROUGH-IN-DIMENSIONSGasand Electrical Characteristics Table of Contents ForewordGeneral Safety Information High Altitude Installations FeaturesHigh Limit Switch Circulating Pump Electronic Ignition ControlExhaust Inducer Blower Assy Dishwashing Machine RequirementHard Water LevelingClearances AIR RequirementsVenting Multiple Heater ManifoldModel BTI-120 Type B GAS VentModel BTI-154 Model BTI-275 Model BTI-250Model BTI-310 GAS Piping Water Line ConnectionsWater Potable Heating and Space System ConnectionsGAS Meter Size Natural Gases only GAS Piping and Dirt LEG InstallationGAS Pressure Regulator Type of GASHeater Wiring Single Unit Wiring Diagram BTI-120 Through 400AGeneral Installation DIAGRAMS-TOP INLET/OUTLET UsageTube Inlet Installation Code RestrictionsVertical Storage Tank and Forced Circulation Horizontal Storage Tank and Forced CirculationPage Installation DIAGRAMS-SIDE INLET/OUTLET Usage Circulating Return Line Connection Heater with Mixing Valve and Recirculated Sanitizing Loop TWO PRE-HEATERS with Booster Heater Horizontal Storage Tank Model Dimension a Manifold KitsOperation Sequence of Operation For Your Safety Read Before Operating What to do if YOU Smell GASCheck the Ignitor Assembly Preventive MaintenanceWater Temperature Control Ignitor AssemblyChecking the Input Remote Storage Tank Temperature ControlGAS Valves Venting SystemFlushing HOT Water OdorAnode ROD Inspection DrainingDeliming Using FLO-JUG Method Tank Cleanout ProcedureDeliming Solvents System Diagnostics ServiceReplacement Parts Ignition Module SystemSequence of Operation Flow Chart YESComplaint Cause User Serviceman Operational ChecklistRemedy Keepthiswarrantypostedadjacenttotheheaterforfuturereference Service and Repair ExpensesClaim Procedure Tank