16Installation
CONNECTING THE DECORATIVE FLUE
1Secure the upper flue to the upper support frame with the mounting screws (3.9 x 9.5mm).
2Insert the lower flue moving it completely towards the top and secure it temporarily with retaining screws (3.9 x 9.5mm).
MOUNTING
SCREWS
(3.9 x 9.5mm)
UPPER
FLUE
LOWER
FLUE
Figure 9
INSERT THE LOWER FLUE
RETAINING
SCREW (3.9 x 9.5mm)
Figure 10
INSTALLING THE DUCT COLLAR
1 Fold the 2 tongues outwards.
2Secure the discharge collar to the hood with (2) retaining screws (3.90 x 9.5mm).
RETAINING |
| |
SCREWS | DISCHAR- | |
(3.9 x 9.5mm) | ||
GE COL- | ||
|
TON-
Figure 11