Electrolux G-11602, G-21602, 20604 G - 21604 Fault Finding, Preliminary Electrical Systems Check

Page 21

Fault Finding

Preliminary Electrical Systems Check

START

Isolate appliance and carry out:

A:Earth Continuity check.

 

 

 

 

 

 

 

 

NO

YES

Carry out:

 

 

 

 

 

C: Polarity check.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Brown Blue Green Yellow

Blue

Brown Green

Yellow

Carry out:

D:Resistance to Earth check.

Has inlet fuse blown?

NO

Inlet wiring faulty. Rectify any fault.

 

 

 

 

 

 

 

 

Electricity supply

 

 

 

should now be

YES

satisfactory.

 

 

 

 

 

PLUG(withcoverremoved)

SOCKET

 

EarthWire

 

 

(faceview)

 

 

 

 

Green/Yellow

(

)

E (

)

 

 

 

 

NeutralWire

 

FUSE

 

 

Blue

 

 

 

 

 

 

 

 

 

N

 

L

Isolate appliance and carry out:

B:Insulation check. Rectify any fault including replacing fusesasnecessary.

55

Image 21
Contents 21604 G 21602 G Gebruiksaanwijzing en InstallatievoorschriftInstallation Important Safety InformationChild Safety During UseService Environmental Information73/23 EEC 90/683 EEC 93/68 EEC 89/336 EEC 90/396 EEC Contents Mod G Description of the HobsDiameter OperationHob Top Maintenance and CleaningPan Supports BurnersSomething Not Working? Electrical supply is switched onCheck that the Rccb has not tripped Check the mains fuse has not blownService and Spare Parts 0870 5 929Calls to this number may be recorded for training purposes Standard guarantee conditions Guarantee ConditionsEuropean Guarantee This guarantee does not coverEngineer technical data Instructions for the InstallerBurner Auxiliary28 Semi-rapid32 Rapid40 Aeration adjustment noneLocation Important safety requirementsInstallation Gas Connection Cut Out Size BuildingBuilding over a cupboard or drawer Building over a kitchen unit with door Sealing gasket supplied with Fitting the hob to the worktopCabinet below Place the sealing gasket Cut outEarth symbol or coloured green and yellow Electrical connectionsBrown Live Permanent Connection Wiring diagramPreliminary Electrical Systems Check Fault FindingEarth Continuity Check Check gas supply at burner Ignition System / Gas IgnitionPressure Testing CommissioningRemove the control knob Method Conversion from Natural Gas to LPG02/03 AEG Hausgeräte GmbH Postfach 90327 Nürnberg Electrolux plc