Andrew ES73 manual Recommended Tools, Tool Size Quantity

Page 7

Recommended Tools

NOTE: Failure to follow an installation procedure could result in damage to equipment or personal injury.

Additional warnings will be displayed throughout this manual for your awareness. These warnings can be identified in warning boxes as shown in the following sample.

Andrew disclaims any liability or responsibility for the results of improper or unsafe installation, operation, or maintenance practices.

Andrew supplies all appropriate hardware/parts required for the installation of your 7.3- Meter Earth Station Antenna. All tools necessary for the installation process should be provided by the installation crew. Andrew recommends the following tools to be used for a proper installation of the 7.3-Meter Earth Station Antenna.

Tool

Size

Quantity

 

 

 

Open End or Combination Wrenches

5/16 Inch

2

 

7/16 Inch

2

 

9/16 Inch

2

 

7/8 Inch

2

 

3/4 Inch

2

 

1/2 Inch

2

 

1-1/4 Inch

1

Crane

1 Ton Minimum Capacity, extended end

1

Nylon Web Slings (2000 pound breaking strength) 3 Inch by 14 Foot

2

Rope or Cord (2000 pound breaking strength)

50 Foot

1

Shackles

5/8 Inch

2

Ladder

10 Foot Extension

1

Drive Sockets

1/16 Inch

1

 

9/16 Inch

1

 

7/8 Inch

1

 

3/4 Inch

1

 

1-1/4 Inch

1

Breaker Bar

1/2 Inch

1

Spud Wrenches

1-1/16 Inch

1

 

1-1/4 Inch

1

Screw Driver

Standard

1

 

Phillips

1

Allen Wrench

7/64 Inch

1

 

3/16 Inch

1

 

1/4 Inch

1

Tape Measure (or other measuring device)

Standard

1

Felt-tip Marker (or other marking device)

Standard

1

Hammer

Standard

1

Rubber Mallet

Standard

1

Pry Bar

Standard

1

Tin Snips

Standard

1

Safety Gloves (each installer)

Standard

1

Table 2-1. Recommended Tools

7

Getting Started

Image 7
Contents Meter ESA Table of Contents Introduction Meter Earth Station AntennaCall From Call To Telephone Fax Proprietary Data Information and Assistance TechnicalHow to Use This Manual Overview ContentGetting Started OverviewTool Size Quantity Recommended ToolsGetting Started Returning Equipment Step Overview Foundation Preparation Installation Procedures1b A-325 Tensioning For bolts over four diameters Tensioning StepTripod Ground Mount Assembly Azimuth Beam Step Support Legs Assembly Step 201315 Supports Step Panning Frame Assembly Step Step 201316 Supports 201487 201488 Panning Frame Outrigger Plate Support 201488 Outrigger Plate Step 301772 Tripod Tube Weldment 300026 Tripod Channel Legs Elevation Jackscrew Assembly Step 301771/301736 Elevation Jackscrew Azimuth Jackscrew Assembly Step Mount Assembly Step 201327A 201313A Step 221345 X 2-1/4 57 mm Upper Lower Collars Installation Procedures Step Horn Assembly Shown for Step 201065A Waveguide Support Equipment Enclosure Step Reflector Backstructure Assembly Step Step Center portion Andrew Flash logo Step Step Step Step Quadrapod Subreflector Strut Assembly Step Installation Procedures Step Step Reflector to Ground Mount Assembly Step Installation Procedures Subreflector Assembly Adjustment Step Step Cross-Axis Grounding Kit Step Step Operation Overview Acquiring a SatelliteStep Polarization at 45 degrees from Optimum Setting Maximizing Odd Transponders Subreflector Adjustment Preventive Maintenance Overview General Cleaning Electrical PartsPreventive Maintenance Antenna Preventive Maintenance Drive System Voltage Current Checks Step Step Preventive Maintenance Jackscrews/Motors Gear Motor/Housing Fill Drain Requirements Lubrication Chart High-Speed Antenna Lubrication Points Medium-Speed Antenna Lubrication Points