Frymaster 8196345 manual Probe Resistance Chart, ATO Automatic Top-Off Service Procedures

Page 35

relay marking the wires to ease reassembly. Once replaced, reconnect the power. When replacing a filter relay in the transformer, ensure the 24VAC relay (8070012) is used.

1.12Probe Resistance Chart

Probe Resistance Chart

For use with Protector® Series fryers manufactured with Minco Thermistor probes only.

F

OHMS

C

60

1059

16

65

1070

18

70

1080

21

75

1091

24

80

1101

27

85

1112

29

90

1122

32

95

1133

35

100

1143

38

105

1154

41

110

1164

43

115

1174

46

120

1185

49

125

1195

52

F

OHMS

C

130

1204

54

135

1216

57

140

1226

60

145

1237

63

150

1247

66

155

1258

68

160

1268

71

165

1278

74

170

1289

77

175

1299

79

180

1309

82

185

1320

85

190

1330

88

195

1340

91

F

OHMS

C

200

1350

93

205

1361

96

210

1371

99

215

1381

102

220

1391

104

225

1402

107

230

1412

110

235

1422

113

240

1432

116

245

1442

118

250

1453

121

255

1463

124

260

1473

127

265

1483

129

F

OHMS

C

270

1493

132

275

1503

135

280

1514

138

285

1524

141

290

1534

143

295

1544

146

300

1554

149

305

1564

152

310

1574

154

315

1584

157

320

1594

160

325

1604

163

330

1614

166

335

1624

168

F

OHMS

C

340

1634

171

345

1644

174

350

1654

177

355

1664

179

360

1674

182

365

1684

185

370

1694

188

375

1704

191

380

1714

193

385

1724

196

390

1734

199

395

1744

202

400

1754

204

405

1764

207

1.13 ATO (Automatic Top-Off) Service Procedures

The automatic top-off system is activated when the oil level falls below a sensor in the rear of the frypot. The signal is sent to the ATO board to engage the solenoid to the frypot and turn on the ATO pump. The pump draws oil from the JIB (Jug In Box) to a port in the rear of the frypot. Once the oil level has satisfied the sensor, the pump and solenoid turn off.

The ATO board is located inside the box, behind the JIB (see Figure 1). The power for the ATO board is supplied from the transformer box. The power passes through the transformer inside the ATO box to the board.

Figure 1

1-29

Image 35
Contents GAS Hour Service HotlineCanada Iii Protector Series GAS Fryers Table of Contents Protector Series GAS Fryers This page Intentionally Left Blank Electronic Ignition System Functional DescriptionInterface Board LED Diagnostic LightsPage Thermostats Accessing Fryers for ServicingChecking the Burner Manifold Gas Pressure Cleaning the Gas Valve Vent TubeNon-CE Standard Burner Manifold Gas Pressures Measuring Flame Current Replacing the Interface Board Replacing the Temperature Probe or High-Limit ThermostatReplacing an Ignition Module Replacing or Cleaning a Combustion Air Blower Adjusting the Air/Gas Mixture ALL Other Valves Replacing a Gas ValveReplacing a Burner Assembly Replacing the Frypot Page Replacing Frypot Insulation and/or Upper Burner Rails Full Vat IllustratedPage Re-assembling a Frypot Full-Vat Illustrated Ignition Failure Troubleshooting and Problem IsolationImproper Burner Function Improper Temperature Control Filtration Malfunctions Computer MalfunctionsVerifying Solenoid Operation Basket Lift Malfunctions LeakageBinds and Jams VAC is not present on the interface board J3 pin 9 LED 5 GV Troubleshooting Guides Troubleshooting the 24 VAC CircuitPage Replacing the Transformer or Filter Relay Troubleshooting the Gas ValveATO Automatic Top-Off Service Procedures Probe Resistance ChartATO Automatic Top-Off Troubleshooting Problem Probable Causes Corrective ActionATO Automatic Top-Off Board Pin Positions and Harnesses 8074646 Function Voltage Wire ColorReplacing the ATO Pump or Solenoid Replacing the ATO Board or TransformerLow temp Hot-hi-1Failure Failure withIgNITION 14.2 CM7 Useful Codes Enter Setup in Tech Mode EnterReset Recovery Fault Call Service Enter 14.3 CM7 Menu Summary Tree 14.4 CM7 Board Pin Positions and Harnesses To update CM7 and ATO software follow these steps Principal Wiring Connections Wiring Diagrams Main Page FPGL330 Transformer / Filter Box Domestic Modular Basket Lift 100/120V Modular Basket Lift 208/250V FPGL30 Series FULL-VAT with ONE DUAL-SPARK Ignition Module Simplified Wiring Diagrams FPGL30 Series Full VatFPGL30 Series Full Vat Australia and Pacific Rim FPGL30 Series FULL-VAT Australia and Pacific RIMFPGL30 Series Simplified Wiring FPGL30 Series Data Network Flowchart Accessories Protector Series GAS Fryers Parts ListBasket Lift Assembly and Associated Parts Component Doors, Sides, Flue Caps, Top Caps and Casters Drain System Components Drain Valves and Associated Parts Drain Tube Sections and Associated Parts Electronics and Electrical Components 2.5.1 Component Boxes Fuse 5A 125V International Only Component BoxesTransformer Boxes FPGL230 Computers and Associated Components Wiring Main Wiring Harnesses 2 CM7 and ATO Wiring Harnesses Refer to wiring diagram on Page Full-Vat Frypot Components Frypot Assemblies and Associated Parts FPGL30 Full Vat Gas Manifold Typical Gas Supply and Combustion System ComponentsComponent Gas Valves and Associated Components Valve, Non-CE Gas Filtration System Components Component Return Valve Assembly and Associated Parts ATO Automatic Top-Off Board ComponentJIB Cradle, JIB/BIB Cap and Pick Up Assembies ATO Automatic Top-Off Solenoid and Pump AssembliesWiring Connectors, Pin Terminals and Tools Fasteners Fasteners This page Intentionally Left Blank Service Hotline