Bloomfield 600 manual Brew Water System POUR-OVER Operation

Page 17

TROUBLESHOOTING GUIDE (continued)

BREW WATER SYSTEM - POUR-OVER OPERATION

15

Image 17
Contents 600 Introduction Safety Warnings and PrecautionsTable of Contents PLUMBER’S Installation Instructions InstallationElectrical Damage Unstable Equipment HazardShock Hazard ELECTRICIAN’S Installation InstructionsBrewer CHECK-OUT Brewer Overall CHECK-OUTBurn Hazard Preparation Brewing CoffeePOUR-OVER Operation Automatic OperationProcedure Clean Coffee Brewer Cleaning InstructionsTheory of Operation POUR-OVER FeatureHOT Water Faucet Brew Water Temperature Control Quick Guide Troubleshooting GuideTroubleshooting Guide Troubleshooting Guide Brew Water System Automatic Brew Water System Automatic or POUR-OVER Operation Brew Water System POUR-OVER Operation Faucet Water System Troubleshooting Guide Troubleshooting Guide Electric Shock Hazard Electrical System Heating Troubleshooting Guide Servicing Instructions Temperature AdjustmentRemove Tank LID Assembly Timer AdjustmentReplace Thermostat Replace Heating ElementReplace Solenoid Clean Solenoid ScreenRepair HOT Water Faucet Replace Timer AssemblyReplace HOT Water Faucet Coil Procedure Delime the Water Tank Servicing Instructions