Bloomfield 600 manual Timer Adjustment, Remove Tank LID Assembly, Replace Thermostat

Page 25

SERVICING INSTRUCTIONS (continued)

TIMER ADJUSTMENT

The amount of water dispensed automatically during a brew cycle is controlled by the timer.

Place empty decanter under brew chamber. Press BREW button. Brewer should dispense one decanter of water. To adjust amount:

Remove brew chamber and button plug. Adjust knob on timer; clockwise increases time. Run several cycles to check amount of water delivered. Replace button plug.

REMOVE TANK LID ASSEMBLY

Unplug brewer or turn circuit breaker OFF. Turn OFF water supply. Remove top panel. Pull vent tube and inlet elbow out of basin pan.

Pull water inlet tube out of basin pan. Remove basin pan.

On models with faucet, disconnect inlet pipe at faucet shut-off valve and outlet pipe at faucet.

Disconnect all wiring from thermostat, hi-limit, and heating element.

Loosen center screw on tank hold-down bracket. Remove hold-down bracket by sliding short slotted end off of locking stud and lifting it off. Remove cover assembly by lifting it straight up.

Reassemble in reverse order.

REPLACE THERMOSTAT

Unplug brewer or turn circuit breaker OFF. Turn OFF water supply. Remove top panel.

Disconnect all wiring from thermostat only. Loosen and free jam nut from pass-thru fitting securing temperature sensing bulb. Remove two screws holding thermostat to bracket.

Lift out thermostat, sensing bulb and thermostat gasket. Reassemble in reverse order.

REPLACE HEATING ELEMENT

Remove tank lid assembly per above.

Remove two hex nuts holding element to cover. Pull element from mounting holes.

Reassemble in reverse order.

IMPORTANT: Water pressure must be between 20 p.s.i and 90 p.s.i. flowing pressure.

If water pressure exceeds this value, or if water pressure varies greatly, a pressure regulator must be installed in the water supply line.

IMPORTANT: Before setting assembly into tank, make sure tank lid gasket is properly seated on flange of lid.

DO NOT OVER-TIGHTEN.

IMPORTANT: When mounting thermostat, be sure a new seal washer is placed below the fitting on the capillary line. Push sensing bulb thru tank lid until fitting seats.

Tighten capillary lock nut only enough to ensure no water leakage. Excessive tightening is not necessary.

IMPORTANT: When replacing heating element, also replace seal gaskets.

23

Image 25
Contents 600 Introduction Safety Warnings and PrecautionsTable of Contents PLUMBER’S Installation Instructions InstallationElectrical Damage Unstable Equipment HazardShock Hazard ELECTRICIAN’S Installation InstructionsBurn Hazard Brewer Overall CHECK-OUTBrewer CHECK-OUT Preparation Brewing CoffeePOUR-OVER Operation Automatic OperationProcedure Clean Coffee Brewer Cleaning InstructionsTheory of Operation POUR-OVER FeatureHOT Water Faucet Brew Water Temperature Control Quick Guide Troubleshooting GuideTroubleshooting Guide Troubleshooting Guide Brew Water System Automatic Brew Water System Automatic or POUR-OVER Operation Brew Water System POUR-OVER Operation Faucet Water System Troubleshooting Guide Troubleshooting Guide Electric Shock Hazard Electrical System Heating Troubleshooting Guide Servicing Instructions Temperature AdjustmentRemove Tank LID Assembly Timer AdjustmentReplace Thermostat Replace Heating ElementReplace Solenoid Clean Solenoid ScreenReplace HOT Water Faucet Coil Replace Timer AssemblyRepair HOT Water Faucet Procedure Delime the Water Tank Servicing Instructions