Bloomfield 600 manual Troubleshooting Guide

Page 20

TROUBLESHOOTING GUIDE (continued)

FAUCET WATER SYSTEM

18

Image 20
Contents 600 Safety Warnings and Precautions IntroductionTable of Contents Installation PLUMBER’S Installation InstructionsElectrical Damage Unstable Equipment HazardELECTRICIAN’S Installation Instructions Shock HazardBrewer CHECK-OUT Brewer Overall CHECK-OUTBurn Hazard Brewing Coffee PreparationPOUR-OVER Operation Automatic OperationCleaning Instructions Procedure Clean Coffee BrewerPOUR-OVER Feature Theory of OperationHOT Water Faucet Brew Water Temperature Control Troubleshooting Guide Quick GuideTroubleshooting Guide Troubleshooting Guide Brew Water System Automatic Brew Water System Automatic or POUR-OVER Operation Brew Water System POUR-OVER Operation Faucet Water System Troubleshooting Guide Troubleshooting Guide Electric Shock Hazard Electrical System Heating Troubleshooting Guide Temperature Adjustment Servicing InstructionsTimer Adjustment Remove Tank LID AssemblyReplace Thermostat Replace Heating ElementClean Solenoid Screen Replace SolenoidRepair HOT Water Faucet Replace Timer AssemblyReplace HOT Water Faucet Coil Procedure Delime the Water Tank Servicing Instructions