Bloomfield 8781A Solenoid Time Adjustment, Remove Tank LID Assembly, Replace Thermostat

Page 18

SERVICING INSTRUCTIONS (continued)

IMPORTANT: Water pressure must be between 20 p.s.i and 90 p.s.i. flowing pressure.

If water pressure exceeds this value, or if water pressure varies greatly, a pressure regulator must be installed in the water supply line.

Fig. 12 Adjust Solenoid Time

IMPORTANT: Before setting assembly into tank, make sure tank lid gasket is properly seated on flange of lid.

IMPORTANT: When mounting thermostat, be sure a new seal washer is placed below the fitting on the capillary line. Push sensing bulb thru tank lid until fitting seats.

Tighten capillary lock nut only enough to ensure no water leakage. Excessive tightening is not necessary.

IMPORTANT: When replacing heating element, also replace seal gaskets.

SOLENOID TIME ADJUSTMENT

The amount of water dispensed automatically during a brew cycle is controlled by the timer. This adjustment must be performed in the COFFEE mode.

Place empty decanter under brew chamber. Press BREW switch. Brewer should dispense one full decanter of water. To adjust amount:

Remove brew chamber and button plug. Adjust timer; clockwise increases time. Run several cycles to check amount of water delivered. Replace button plug.

REMOVE TANK LID ASSEMBLY

Unplug brewer or turn circuit breaker OFF. Turn OFF water supply. Remove top panel.

Disconnect brew fill and outlet tubes from tank lid fittings.

Disconnect faucet supply and outlet tubes from flare fittings on tank lid.

Disconnect all wiring from thermostat, hi-limit and heating element.

Loosen center screw on tank hold-down bracket. Remove hold-down bracket by sliding short slotted end off of locking stud and lifting it off. Remove cover assembly by lifting it straight up. Reassemble in reverse order.

REPLACE THERMOSTAT

Unplug brewer or turn circuit breaker OFF. Turn OFF water supply. Remove top panel.

Disconnect all wiring from thermostat only. Loosen and free jam nut from pass-thru fitting securing temperature sensing bulb. Remove two screws holding thermostat to bracket.

Lift out thermostat, sensing bulb and thermostat gasket. Reassemble in reverse order.

REPLACE HEATING ELEMENT

Remove tank lid assembly per above.

Remove two hex nuts holding element to cover. Pull element from mounting holes.

Reassemble in reverse order.

M628 76201 Owners Manual 8781A Tea Brewer

16

Image 18
Contents 628 Warranty Statement Table of Contents SpecificationsApplicability Features and Operating Controls Precautions and General Information Agency Listing InformationInstallation PLUMBER’S Installation InstructionsLeveling the Unit Installation ELECTRICIAN’S Installation InstructionsOperation START-UP Operational NotesCoffee POUR-OVER Option Automatic Operation TimerAutomatic Operation HOT Water FaucetBrewing Coffee PreparationBrewing TEA Tea Brew ChamberCleaning Instructions FrequencyTools Troubleshooting Suggestions Symptom Possible Cause Suggested RemedySymptom Suggested Remedy TOP Panel Access PanelsServicing Instructions Front PanelTemperature Adjustment Elevation feet above seal levelReplace Thermostat Solenoid Time AdjustmentRemove Tank LID Assembly Replace Heating ElementReplace Solenoid Clean Solenoid ScreenReplace Timer Assembly Replace HOT Water Faucet CoilReplace Control Panel Light or Switch Repair HOT Water FaucetProcedure Delime the Water Tank Precautions8781A Exploded Views & Parts List 8781A Exploded Views & Parts List Tank LID Assembly 8781A Service KitsService Kits Faucet Repair Kits8781A Wiring Diagram Telephone Fax