SERVICING INSTRUCTIONS (continued)
IMPORTANT: Water pressure must be between 20 p.s.i and 90 p.s.i. flowing pressure.
If water pressure exceeds this value, or if water pressure varies greatly, a pressure regulator must be installed in the water supply line.
Fig. 12 Adjust Solenoid Time
IMPORTANT: Before setting assembly into tank, make sure tank lid gasket is properly seated on flange of lid.
IMPORTANT: When mounting thermostat, be sure a new seal washer is placed below the fitting on the capillary line. Push sensing bulb thru tank lid until fitting seats.
Tighten capillary lock nut only enough to ensure no water leakage. Excessive tightening is not necessary.
IMPORTANT: When replacing heating element, also replace seal gaskets.
SOLENOID TIME ADJUSTMENT
The amount of water dispensed automatically during a brew cycle is controlled by the timer. This adjustment must be performed in the COFFEE mode.
Place empty decanter under brew chamber. Press BREW switch. Brewer should dispense one full decanter of water. To adjust amount:
Remove brew chamber and button plug. Adjust timer; clockwise increases time. Run several cycles to check amount of water delivered. Replace button plug.
REMOVE TANK LID ASSEMBLY
Unplug brewer or turn circuit breaker OFF. Turn OFF water supply. Remove top panel.
Disconnect brew fill and outlet tubes from tank lid fittings.
Disconnect faucet supply and outlet tubes from flare fittings on tank lid.
Disconnect all wiring from thermostat,
Loosen center screw on tank
REPLACE THERMOSTAT
Unplug brewer or turn circuit breaker OFF. Turn OFF water supply. Remove top panel.
Disconnect all wiring from thermostat only. Loosen and free jam nut from
Lift out thermostat, sensing bulb and thermostat gasket. Reassemble in reverse order.
REPLACE HEATING ELEMENT
Remove tank lid assembly per above.
Remove two hex nuts holding element to cover. Pull element from mounting holes.
Reassemble in reverse order.
M628 76201 Owners Manual 8781A Tea Brewer
16