OPERATION (continued)
M628 76201 Owners Manual 8781A Tea Brewer
A.START-UP
For initial
♦Be sure spray disk and brew gasket are properly installed in the brew head.
♦Be sure the water supply is properly connected and the water supply valve is turned ON.
♦Be sure the WATER TANK IS FILLED.
IMPORTANT: Fill the water tank before energizing this unit:
1.Insert the "COFFEE" brew chamber (empty) and place an empty container in place under the brew chamber.
2.Be sure the TANK HEATER SWITCH on back of brewer "OFF".
3.Plug the unit into an appropriate receptacle.
4.Press COFFEE/TEA switch to "COFFEE". Press BREW SWITCH. Water will begin filling the tank. When the water fill stops, press the switch again. Repeat until water flows from the brew chamber.
This will usually require running three (3) cycles.
5.When water starts to flow from the brew chamber, tank is full. When all dripping has stopped, discard all water in container.
6.Turn TANK HEAT SWITCH "ON". The heating elements will begin heating the water in the tank. When the water has reached the proper temperature, the “READY TO BREW” light will glow.
B. OPERATIONAL NOTES
1.COFFEE
a.When brewing coffee, be sure to use the "coffee" brew chamber (uses the tall rack, and does not state "tea only" on the outside of the shell).
b.Press the COFFEE/TEA switch to "COFFEE".
c.COFFEE MODE will brew 64 oz. of coffee.
d.Use a standard 64 oz. decanter.
2.TEA
a.When brewing tea, be sure to use the "tea" brew chamber (uses the short rack, and states "tea only" on the outside of the shell).
b.Press the COFFEE/TEA switch to "TEA".
c.Select either "1 gallon" or "3 gallon brew".
d.Use a dispenser of the appropriate size. Be sure dispenser is positioned so that water from the BYPASS NOZZLE flows into the dispenser.
IMPORTANT:
Tank must be full of water before tank heater switch "ON". Heating element will be damaged if allowed to operate without being fully submerged in water. Damage caused by operating the brewer without water in the tank is NOT COVERED BY WARRANTY.
NOTE:
After tank is filled, turn the tank heater switch "on". Brewer will require approximately 18 minutes to heat water to operating temperature.
7