Panasonic NN-S560WF Measurements and Adjustments, Measurement of microwave output, 1min. test

Page 19

MEASUREMENTS AND ADJUSTMENTS

WARNING

* For continued protection against radiation hazard, replace only with identical replacement parts(For touch m o d e l s P a r t N o . A N E 6 1 4 2 - 1 4 5 0 , T y p e N o . V-16G-3C26-M for Primary latch switch; Part No. A61425180AP, Type No. L-3C2-2 for Secondary latch switch; Part No. A61785180AP, Type No. L-2C2-2 for short switch and Part. No. AEG5J1EG12B/AEG5J1EG18B, Type No. G5J-1-TP for power relay B(RY1))

*When the 18 Amp. fuse is blown due to the operation of the short switch, you must replace power relay B. Primary

latch switch and the short switch. Then follow the installa- tion procedures below.

*Interlock switch replacement In replacing faulty switches, be sure mounting tabs are not bent, broken or

otherwise deficient in their ability to hold the switches.

*Refer to schematic diagram to ensure proper connec- tion.

1.Adjustment of Primary latch switch, Second-

ary latch switch and Short switch.

(A)When mounting Primary latch switch,Secondary latch switch and short switch to door hook assembly, mount the Primary latch switch, the Secondary latch switch and the short switch to the

door hook assembly as shown in table.

NOTE: No specific adjustment during installation of Primary latch switch, Secondary latch switch and short switch to the door hook is necessary.

(B)When mounting the door hook assembly to the oven assembly, adjust the door hook assembly by moving it in the direction of arrow in the illustration so that the oven door will not have any play in it. Check for play in the door by pulling the door assembly. Make sure that the latch keys move smoothly after adjustment is completed. Completely tighten the screws holding the door hook assembly to the oven assembly.

(C)Reconnect the short switch and check the continuity of the monitor circuit and all latch switches again by following the components test procedures.

2. Measurement of microwave output

The output power of the magnetron can be determined by performing IEC standard test procedures. However,due to the complexity of IEC test procedures, it is recommended to test the magnetron using the simple method outlined below.

Necessary Equipment:

*1 liter beaker *Glass thermometer *Wrist watch or stopwatch

NOTE: Check the line voltage under load.Low voltage will lower the magnetron output. Take the temperature readings and heating time as accurately as possible.

(A)Fill the beaker with exactly one liter of tap water.Stir the water using the thermometer and record the beaker’s temperature. (recorded as T1).

(B)Place the beaker on the center of glass cook plate.

Set the oven for High power and heat it for exactly one minute.

(C)Stir the water again and read the temperature of the beaker. (recorded as T2).

(D)The normal temperature rise at High power position for each model is as shown in table.

SWITCH

GAP SHOULD BE <0.7MM.

ACTUATOR

LEVER

SCREW

PRIMARY

LATCH

SWITCH

DOOR

DOOR HOOK

ASSY

SHORT

SWITCH

SECONDARY

LATCH

SWITCH

SCREW

01-033

TABLE (1L-1min. test)

RATED OUTPUT

TEMPERATURE RISE

 

 

1000~1100W(IEC705-88)

Min. 16.2oF(9oC)

 

 

1200~1300W(IEC705-88)

Min. 17.6oF(9.5oC)

 

 

- 18 -

Image 19
Contents RPH Model refer to the last Microwave OvenContents Inverter Warning Control Panel Feature ChartStop/Reset Pad Operation Scroll Display Operation and Digital Programmer Circuit Test ProcedureChild Schematic Diagram APH Schematic Diagram CPH Description of Operating Sequence Variable power cooking controlInverter Power Supply Circuit NEW H,V Variable Power CookingExplanation of the Auto Sensor Cooking process Sensor Cooking NN-S560BFAPH/CPH NNSensor Reheat NN-S560BFAPH/CPH,NN-S560WF APH/CPH Inverter Warnings NEW H.V Check the groundingMicrowave Radiation Confirm after repairDisassembly and Parts Replacement Procedure Until alignment is achieved Door assemblySteam Sensor Inverter Power Supply U Membrane key board Membrane switch assembly Primary Latch Switch, Secondary Secondary LatchSwitch and Power Relay B Interlocks Short Switch & MonitorSteam Sensor and Digital Programmer Circuit Measurement of microwave output Measurements and Adjustments1min. test Procedure for measuring radiation leakage Procedure for Measuring Microwave Energy LeakageRecord keeping and notification after measurement Symptom Cause Corrections Troubleshooting GuideDPC Troubleshooting of Inverter Circuit U and Magnetron NEW H.V Trouble Related to Digital Programmer Circuit Exploded View and Parts List Ref.No Part name & Description Pcs Remarks Set Parts ListFAN Motor 4T0 Ref.No Part name & Description Pcs Remarks Set Door AssemblyEscutheon Base Assembly Packing and Accesories Wiring Material Digital Programmer Circuit Parts ListDigital Programmer Circuit Page Page Model for Latin America & Mexico