SERVICE
This section provides procedures for testing and replacing various major components used in this brewer should service become necessary. Refer to Troubleshooting for assistance in determining the cause of any problem.
WARNING - Inspection, testing, and repair of electri- cal equipment should be performed only by qualified service personnel. The brewer should be disconnected from the power source when servicing, except when electrical tests are required and the test procedure spe- cifically states to
COMPONENT ACCESS
WARNING - Disconnect the brewer from the power source before the removal of any panel or the replace- ment of any component.
All components are accessible by the removal of the top cover and rear inspection panel.
The top cover is attached with four
Contents |
|
Brew Solenoid Valve | 15 |
Brew Timer (Early Models) | 16 |
Digital Brew Timer (Late Models) | 17 |
Control Thermostat | 19 |
Limit Thermostat | 20 |
ON/OFF Switch | 21 |
Start Switch | 22 |
Tank Heater | 23 |
Sweetener Solenoid Valve | 24 |
OFF/SELECTOR Switch (Sweetener Option) | 25 |
Wiring Diagrams | 26 |
FIG. 1 COMPONENT ACCESS | P2092.40 |
|
Page 14 | 10288 031604 |
|