Bunn LCA-2, LCC-2 manual Selecting the Correct Pump Tubing, Dispense, Rate, Oz/sec 16 I.D. Tubing

Page 7

SELECTING THE CORRECT PUMP TUBING

There are two pump tube sizes available for use with this dispenser. To determine the correct tubing for you application, first determine the dispenser flow rate you intend to use, refer to Setting Dispenser Flow Rate. Then look up the recommended tube size for the mix ratio of your concentrate, refer to the Tube Selection Chart.

 

 

 

 

 

 

TUBE SELECTION CHART

 

 

 

 

 

 

 

 

 

 

Dispense

Concentrate Ratios

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Rate

25

30

35

40

45

50

55

60

65

70

75

 

80

85

90

 

95

100

 

1.8 Oz/sec.

3/16” I.D. TUBING

 

 

 

 

1/8” I.D. TUBING

 

 

 

 

 

 

(53 ml/sec.)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

2.5 Oz/sec.

3/16” I.D. TUBING

 

 

 

 

 

 

 

1/8” I.D. TUBING

 

 

 

(74 ml/sec.)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Examples:

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

1.For a Dispenser Flow Rate of 2.5 Oz./sec (74 mL/sec) and a Mix Ratio of 35:1 – use 3/16” I.D. Tubing.

2.For a Dispenser Flow Rate of 1.8 Oz./sec (53 mL/sec) and a Mix Ratio of 60:1 – use 1/8” I.D. Tubing.

Tube kits can be purchased from BUNN-O-MATIC.

Part # 34727.1000 for 3/16” I.D. Tubing or #34728.1000 for 1/8” I.D. Tubing.

INSTALLING THE PUMP TUBING (Refer to the Tubing Installation Instructions in side the cabinet door for details.)

1.Loosen the thumbscrew securing the tubing retainer plate to the pump housing. Set it and the retainer plate aside.

2.Depress the tension screw and remove it from the notch in the pump body, releasing the spring tension on the pump band.

3.Apply lubricant (BUNN-O-MATIC part number M2531.0001) to the new pump tubing.

4.Insert the tubing onto the mix chamber port and wrap the tubing around the pump rotor, making sure that the elbow and clamps end up on the bottom side of the pump body.

5.Close the compression band reinsert the tension screw into the notch in the pump housing.

6.Replace the tubing retainer plate and tighten the thumbscrew.

7.Reconnect bag connector to the product box.

8.Repeat steps 1 through 7 for the other pump.

9.Prime the pumps. Refer to Priming the Concentrate Lines section.

Thumbscrew

 

 

 

 

 

 

 

 

 

 

 

 

 

Tension

 

 

 

 

2.0”

 

 

 

 

 

2.0”

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Screw

 

Lubricate between arrows

 

 

Remove Retaining Plate Release Spring Tension

Remove Tubing

 

 

Lubricate New Tube

Tension Screw

 

Tube Clamp

 

Install New Tubing

Completed Installation

34766 112502

Image 7
Contents Phone 217 529-6601 FAX 217 Post Office BOX SPRINGFIELD, IllinoisBUNN-O-MATIC Commercial Product Warranty Contents28181.0003 IntroductionUser Notices 00656.0000Electrical Requirements Field Wiring Terminal Block DiagramModels without Master ON/OFF Switch Models with Master ON/OFF SwitchPlumbing HOOK-UP Plumbing RequirementsInitial SET-UP Electrical HOOK-UPRemoving the restrictors Setting Dispenser Flow RateReprogramming the Dispenser Flow Rate Oz/sec 16 I.D. Tubing Selecting the Correct Pump TubingDispense Rate1513 Operating Controls and InterfaceInitial Fill & Heat Rinse Alarm Feature FlavorGard FeatureAlarm Mode Brew Temperature Lockout Feature BIB Empty Lockout FeatureExit 3/16 Programming the DispenserMenu Screen Action Description Tank Temp 351 +0oz + LF Disp VolumeRT Disp Volume Menu Screen Lock Flavor ? Exit YES Flavors LockedCabinet Temp Menu Screen Tank TempExit + Ready TempAction Description Menu ScreenRinse Lockout ? No Exit YES Brew Lockout ? No Exit YESCAL Right Side ? Exit YES Menu Screen ActionCAL Right Pump ? Pull Dispenser CAL RT WTR Flow Pull DispenserFactory Defaults No YES Action Description WTR Start DelayWTR Stop Delay Test LED’S ? No Exit YES Test Switches ?Priming the Concentrate Lines Loading the ConcentrateFilling Cambros or other large containers Operating the Pull & Hold DispenserModels LCA-2 PC, LCA-2C PC, LCA-2A PC Operating the Preset Portion Control DispenserWeekly Sanitizing Cleaning & Preventative MaintenanceGeneral Cleaning and Sanitizing Procedures Daily Rinsing Daily Parts WashingReplacing the Pump Tubing Draining the HOT Water Tank Power LED OFF TroubleshootingFront Panel LED Display Messages Empty BIB Warning Internal FaultLeft Refill LED on Concentrate BIB is EmptyPossible Cause Troubleshooting Dispenser Diagnostics-LCD DisplayBIB Not properly connected Check BIB Connector Fittings Tubing kinked or blocked Check Tubing installationScreen Displayed Possible Cause Cabinet circulating fan failure Service Required Evaporator temperature too high Service RequiredMotor failure Service Required RPM Sensor failure Service RequiredCalibrating the Left Side Dispenser Calibrating the Right Side Dispenser Field Calibrating the Hot Water Flow RateOz/sec 53 ml/sec w/ flow restrictor Oz/sec 74 ml/sec w/o flow restrictorCalibrating The Empty BIB Threshold Field Calibrating the Empty BIB WarningLCA-2/LCA-2, PC/LCA-2C/LCA-2C, PC/LCC-2/LCC-2C Schematic Wiring Diagram Schematic Wiring Diagram LCC-2A/LCA-2A/LCA-2A, PC
Related manuals
Manual 36 pages 62.09 Kb Manual 26 pages 22.61 Kb

LCA-2 PC, LCA-2, LCC-2 specifications

The Bunn LCC-2, LCA-2 PC, and LCA-2A are high-performance commercial coffee brewers designed to meet the demands of busy coffee shops, restaurants, and other food service establishments. These machines are known for their efficiency, durability, and advanced brewing technologies, making them popular choices in the industry.

Starting with the Bunn LCC-2, this brewer is recognized for its compact design and ease of use. It has a brewing capacity of up to 3.8 gallons per hour, ensuring that coffee is ready quickly during peak hours. The LCC-2 uses a pour-over brewing method, which means that water is heated to the ideal brewing temperature and then poured over coffee grounds for optimal extraction. One of its standout features is the digital temperature control, which allows operators to adjust brewing temperatures easily for different coffee types. Additionally, the Bunn LCC-2 features a stainless steel construction that enhances durability and provides a sleek look for any commercial kitchen.

Moving on to the Bunn LCA-2 PC, this model includes programmable capabilities, making it perfect for establishments that require consistency and convenience. The LCA-2 PC allows users to preset brewing schedules and customize brew cycles, ensuring that each pot of coffee meets specific flavor profiles. This model is designed with a large-capacity brewing system that can produce up to 7.5 gallons of coffee per hour, making it an ideal choice for high-demand environments. It also boasts a built-in hot water faucet, which provides instant hot water for other beverages or culinary applications. The LCA-2 PC's advanced brewing automation helps maintain optimal brew quality while minimizing waste.

Lastly, the Bunn LCA-2A is an advanced version that focuses on automation and efficiency. This brewer features a state-of-the-art digital brew timer, which allows precise control over brew times, leading to consistent flavor extraction. The LCA-2A also integrates with Bunn’s patented brewWISE technology, which tracks brew recipes and monitors performance. The intuitive interface allows for easy operation, even for staff who may be less experienced with coffee brewing. With a capacity of up to 4 gallons per hour and a durable stainless steel frame, the LCA-2A ensures longevity while delivering exceptional coffee.

In summary, the Bunn LCC-2, LCA-2 PC, and LCA-2A represent the pinnacle of commercial coffee brewing technology. Their unique features, including programmable settings, large brewing capacities, and durable constructions, cater to the diverse needs of the food service industry. Each model emphasizes convenience, flexibility, and quality, making them invaluable assets in any professional coffee environment.