Hoshizaki DKM-500BAH service manual LED Lights and Audible Alarm Safeties, Pm, Sr, Dv

Page 12

f) LED Lights and Audible Alarm Safeties

The red LED indicates proper control voltage and will remain on unless a control voltage problem occurs. At startup a 5 second delay occurs while the board conducts an internal timer check. A short beep occurs when the power switch is turned OFF.

The green LEDs 1 through 4 energize and sequence from initial startup as listed in the table below. Note that the order of the LEDs from the outer edge of the board is 1, 4, 3, 2. For more information, see "II.B. Sequence of Operation."

Sequence Step

LED

Energized

 

Time LEDs are On

Components

Min.

Max.

Avg.

 

 

 

 

 

1 Minute Fill Cycle

4

WV

 

 

60 seconds

Harvest Cycle

1, 4, and 2

WV, HGV,

2 minutes

20 minutes

3 to 5 minutes

 

 

Comp

 

 

 

Freeze Cycle

1

Comp, PM,

5 minutes

freeze timer

30 to 35 minutes

 

 

FMS

 

setting

 

 

 

 

 

 

 

Pump Out

1, 3, and 2

Comp, HGV,

10 seconds

20 seconds

factory setting

 

 

PM, SR, DV

 

 

 

 

 

 

 

 

 

The built in safeties shut down the unit and have alarms as follows:

No. of Beeps

Type of Alarm

Notes

(every 3 sec.)

 

 

 

 

 

1

High Evaporator Temp.

Check for harvest problem (stuck HGV or

 

(temperature > 127°F)

relay), hot water entering unit, or shorted

 

(53°C)

thermistor.

 

 

 

2

Harvest Backup Timer

Orange LED marked H TIMER lights up.

 

(harvest > 20 min. for two

Check for open thermistor, HGV not

 

cycles in a row)

opening, TXV leaking by, low charge, or

 

 

inefficient compressor.

 

 

 

3

Freeze Timer

Yellow LED marked F TIMER lights up.

 

(freeze > specified setting

Check for F/S stuck closed (up), WV

 

for two cycles in a row)

leaking by, HGV leaking by, TXV not

 

Timer is factory set using

feeding properly, low charge, or inefficient

 

dip switches 9 & 10

compressor.

 

 

 

4

Short Circuit

Resistor wire harness shorted. Check

 

(between the K4 connec-

and replace wire harness if necessary.

 

tion on the control board

 

 

and the bin control)

 

 

 

 

5

Open Circuit

Resistor wire harness circuit open or

 

(between the K4 connec-

control board open. Check and replace

 

tion on the control board

component if necessary.

 

and the bin control)

 

 

 

 

To manually reset the above safeties, press the alarm reset button with the power supply on.

12

Image 12 Contents
DKM-500BAH Hoshizaki AMERICA, INC Contents Page Specifications DKM-500BAHII. General Information Construction DKM-500BAHSequence of Operation DKM-500BAH Sequence Flow Chart and Component Operation CycleControl Board Control Products E Control Board Control Board LayoutControl Board Harvest Backup Timer and Freeze Timer High Temperature SafetyLow Water Safety Maximum Water Supply Period 6 minutesLED Lights and Audible Alarm Safeties PM, SR, DVControls and Adjustments Default Dip Switch SettingsHarvest Control Thermistor Harvest Timer dip switch 1 Pump-Out Timer dip switch 3Pump-Out Frequency Control dip switch 5 Freeze Timer dip switch 9Bin Control Bin Control Troubleshooting Control Board Check ProcedureMachine Will Not Start Machine Will Not Shut OffSwitches Control Board ReplacementControl Switch Service SwitchCirculate WashDKM-500BAH Wiring Diagram Timing Chart Page Performance Data 110IV. Service Diagnosis Minute Diagnostic Procedure Diagnostic Charts Ice MakingNo Ice Production Problem Possible Cause Remedy Problem Possible Cause Remedy Evaporator is Frozen Up Low Ice Production Abnormal IceOther DispensingProblem Possible Cause Remedy Removal and Replacement of Components Service for Refrigerant LinesRefrigerant Recovery Evacuation and Recharge R-404ARemoval and Replacement of Compressor BrazingRemoval and Replacement of Drier Removal and Replacement of Expansion Valve Removal and Replacement of Hot Gas ValveRemoval and Replacement of Evaporator Removal and Replacement of Condenser Removal and Replacement of Thermistor Removal and Replacement of Fan MotorRemoval and Replacement of Inlet Water Valve Removal and Replacement of Pump MotorRemoval and Replacement of Spray Tubes Removal and Replacement of Gear MotorRemoval and Replacement of Dispense Switch Removal and Replacement of SolenoidVI. Cleaning and Maintenance Instructions Cleaning InstructionsCleaning Procedure Icemaker Sanitizing Procedure Icemaker Cleaning Procedure Bin Sanitizing Procedure BinMaintenance Instructions Preparing the Icemaker for Long StorageExterior Panels Air Filters