Manitowoc Ice manual Q130 Models, Q130 Water Distribution Tube Removal, Float Valve Removal

Page 25

Section 4

Maintenance

 

 

Q130 Models

DISTRIBUTION

TUBE

THUMBSCREW

REMOVE ICE

THICKNESS PROBE

THUMBSCREW

Q130 Water Distribution Tube Removal

Loosen the two thumbscrews, which secure the distribution tube.

Lift the distribution tube up off the thumbscrews.

Disassembly

Twist the barbed end until the tab lines up with the keyway.

Pull the inner tube end outward.

TAB

KEYWAY

Q130 Water Distribution Tube Disassembly

E.Remove the Float Valve

Turn the splash shield counterclockwise one or two turns.

FLOAT VALVE

BRACKET

COMPRESSION

FITTING

SHUT-OFF VALVE

SPLASH SHIELD

CAP AND

FILTER SCREEN

FLOAT

Float Valve Removal

Pull the float valve forward and off the mounting bracket.

Disconnect the water inlet tube from the float valve at the compression fitting.

Remove the cap and filter screen for cleaning.

Part Number 000001130 12/08

4-3

Image 25
Contents Q130/Q210/Q270 UnderCounter Model Ice Machines Procedural Notices Safety NoticesRead These Before Proceeding Personal Injury PotentialTable of Contents Section Maintenance Table of Contents Section OperationSection Before Calling for Service Section General Information AccessoriesModel Numbers Q270 Models General Information Section Model/Serial Number LocationModel/Serial Number Location Ice Machine Model Number Serial NumberAuthorized Warranty Service Commercial Warranty Coverage GeneralService Calls GeneralGeneral Information Section Ice Machine Dimensions Section Installation InstructionsGeneral Q130/Q210 ICE MachinesIce Machine Heat of Rejection Installation Instructions Section Location of Ice MachineSeries Heat of Rejection Ice Machine Air Conditioning Peak Checking Ice Machine Level Section Installation Instructions Leveling the Ice MachineInstallation Instructions Section Electrical Service Water Supply Section Installation Instructions Water Service/DrainsWater Inlet Lines Drain ConnectionsTypical Water Supply Drain Installation Personal Injury Potential Installation Instructions Section Installation Checklist Component Identification OperationInitial START-UP or START-UP After Automatic SHUT-OFF Operation Section Ice Making Sequence of OperationSection Operation Energized Parts Chart Siphon System Operation Section Operational ChecksSiphon System Check Water Float Valve CheckWater Level Check Section OperationICE Bridge Thickness Check Ice Thickness CheckOperation Section Interior Cleaning and Sanitizing Section MaintenanceCleaning and Sanitizing Procedure Maintenance Section Q130 Water Distribution Tube Removal Q130 ModelsFloat Valve Removal Remove the Water Trough Remove the ice damper InstallationQ130 Q210/Q270Solution Type Water Mixed With Sanitizer Solution Type Water Mixed withRemove the Bin Door ICE Machine Inspection Exterior CleaningModel Amount of Sanitizer Air-Cooled Condenser Cleaning the CondenserWater-Cooled Condenser Water Regulating Valve SELF-CONTAINED AIR-COOLED ICE Machines Maintenance Section Removal From Service WinterizationWATER-COOLED ICE Machines Pry Open the Water Regulating ValveThis page Intentionally Left Blank Maintenance Section Checklist Section Before Calling for ServiceProblem Possible Cause To Correct Safety Limit Feature Before Calling for Service SectionSafety Limit Stand-By Mode Safety LimitsDetermining Which Safety Limit Stopped The Ice Machine Safety Limit NotesPossible Cause Check/Correct Safety Limit #1Safety Limit #2 This page Intentionally Left Blank