Pentair Model 5600 & 5600 Econominder manual Job Specification Sheet, Control Valve Specifications

Page 3

Model 5600 & 5600 Econominder®

Job Specification Sheet

Job Number ___________________________________

Model Number ________________________________

Water Test ____________________________________

Capacity of Unit ________________________ Max. _____________ Per Regeneration

Mineral Tank Size: Diameter ___________________ Height _____________________

Brine Tank Size and Salt Setting Per Regeneration: ___________________________________

Control Valve Specifications

Type of Timer: ___ Std.

___ "L" ___ 7-day ___ 12-day ___ Meter, Std. ___ Meter, Ext.

Day/Time of Regeneration _____________________________

Drain Line Flow Control _______________________________ gpm

Brine Refill Rate _____________________________________ gpm

Injector Size ________________________________________

Meter Gallon Setting _________________________________ gal

 

 

Slow Rinse

Brine Draw

 

 

Tank Size

 

Rate (gpm)

Rate (gpm)

BLFC1

BLFC2

(diameter)

Injector

@ 40 psi

@ 40 psi

 

 

 

 

 

 

6"

#0 red

.31 gpm

.28 gpm

.5 gpm

1.2 gpm

7"

#0 red

.31 gpm

.28 gpm

.5 gpm

1.2 gpm

 

 

 

 

 

 

8"

#1 white

.45 gpm

.38 gpm

.5 gpm

1.5 gpm

9"

#1 white

.45 gpm

.38 gpm

.5 gpm

2.0 gpm

10"

#1 white

.45 gpm

.38 gpm

.5 gpm

2.4 gpm

 

 

 

 

 

 

12"

#2 blue

.84 gpm

.56 gpm

1.0 gpm

3.5 gpm

13"

#2 blue

.84 gpm

.56 gpm

1.0 gpm

4.0 gpm

 

 

 

 

 

 

14"

#3 yellow

1.0 gpm

.63 gpm

1.0 gpm

5.0 gpm

16"

#3 yellow

1.0 gpm

.63 gpm

1.0 gpm

7.0 gpm

 

 

 

 

 

 

NOTE: Due to varying water conditions, tank sizes and water pressures, use the above settings as guidelines only.

1BLFC (Brine Line Flow Control), refill rate for filling brine tank.

2DLFC (Drain Line Flow Control), backwash and rapid rinse flow rates.

3

Image 3
Contents Model 5600 & 5600 Econominder Table of Contents Control Valve Specifications Job Specification SheetGeneral Residential Installation Check List Valve Installation and Start-up Procedures Model 5600 Softener Control Model 5600 Installation and Start-up ProceduresModel 5600 Backwash Filter Control Before Plugging in the UnitPreliminary Rinse position Cycle Times and Flow DiagramsModel 5600 Econominder Model 5600 Econominder Installation and Start-up ProceduresService Position Water Conditioner Flow DiagramsBackwash Position Water Conditioner Flow Diagrams Cont’dSlow Rinse Position Settling Rinse Position Model 5600 Control Valve Drive Assembly Model 5600 Control Valve Drive AssemblyItem Number No. Req’d Model 5600 and 5600 Econominder Control Valve Drive Assembly Item Number No. Req’d Part Number Description Model 5600 Econominder Control Valve Drive Assembly Model 5600 Econominder Control Valve Drive AssemblyItem Number No. Req’d Bypass Valve Assembly, Plastic Bypass Valve Assembly, PlasticBypass Valve Assembly, Brass Bypass Valve Assembly, BrassModel 5600 Econominder Meter Assembly Model 5600 Econominder Meter AssemblyReplace Time Brine Valve, Injectors and Screen Service InstructionsReplace Timer Service Instructions Cont’dReplace Piston Assembly Replace Seals and Spacers Replace Meter Replace Meter Cover and/or Impeller Problem Cause Correction Model 5600 and 5600 Econominder TroubleshootingGeneral Service Hints for Meter Control Model 5600 and 5600 Econominder Troubleshooting Cont’dModel 5600SF Troubleshooting Service Assemblies Model 5600 & 5600 Econominder Model 5600 & 5600 Econominder Page 40106 Rev. H 05/05