GE ZV900 installation instructions Mount the Hood, Level the Hood, Connect Ductwork, Screw Screw

Page 13

Installation Instructions

INSTALLATION—VENTED TO THE OUTSIDE

5 MOUNT THE HOOD

WARNING: 2 people are required to lift and position the hood onto the mounting bracket.

AVERTISSEMENT :

If faut deux personnes pour lever et mettre en place la hotte sur le support de montage.

Lift the hood onto the mounting bracket.

Position a spirit level at the bottom of the hood to check side to side leveling.

6 LEVEL THE HOOD

This hood has built-in levelers on the mounting hooks at each side. Use a long Phillips screwdriver from the front to access the levelers.

Levelers

Use the top screw hole in the leveler to raise or lower the hood on that side.

Use the bottom screw hole to pull the hood tight against the wall surface.

Screw hole

Mark hole location at the bottom of the hood.

Remove the hood. If the bottom screw hole does not enter a stud, enlarge the hole to 3/8and install wall fastener anchors.

Place the hood back onto the mounting bracket, check level again and install the wall fastener.

7CONNECT DUCTWORK

Install ductwork, making connections in the direction of airflow as illustrated.

Push duct over the exhaust outlet and damper.

Secure joints in ductwork with sheetmetal screws.

Wrap all duct joints and the flange connections with duct tape for an airtight seal.

Airflow

Duct tape over seam

and screw Screw

CAUTION: Do not use sheet metal screws at the hood flange connection. Doing so will prevent proper damper operation. Seal connection with tape only.

PRUDENCE :

Il ne faut pas utiliser de vis autoraurdeuses à la connexion du collet de la hotte. Ceci empêcherait le bon fonctionnement du registre. N’utiliser que du ruban adhésif pour assurer l’étanchéité du raccord.

12

Image 13
Contents Installation Instructions Rear Wall Mounting Template Before YOU Begin Installation Options ContentsAdvance Planning Power SupplyImportant Please read carefully Flexible ducting Duct FittingsDo not use flexible plastic ducting Tools and Materials Required not Supplied Remove the PackagingHood 36 Min Vent hood must be installed 24″ min. Determine Installation Height30 Max Fasteners Wood 23-7/8 Check Installation Hardware11-1/2 Hood Thumb Attachment Screws Install Framing for Hood Support DUCTWORK, Wiring LocationsCeiling ducting Wall DuctingInstall Duct Bracket Install Mounting BracketCheck to be sure that the bracket is level Secure the bracket to the wallPrepare the Hood Level the Hood Mount the HoodConnect Ductwork Screw ScrewConnect Electrical Verify that power is turned off at the sourceInstall Filters Install Duct CoversFinalize Installation Important Framing must be capable of supporting 100 lbs INSTALLATION-RECIRCULATINGInstall Mounting Bracket Bottom view Size and CUT Duct Piece Dimension by 1″ to Facilitate installationCharcoal filter Install Duct Covers Install FiltersMetal filter Remove all tape and packing materialFor Monogram local service in your area, call
Related manuals
Manual 12 pages 60.71 Kb

ZV900 specifications

The GE ZV900 is a state-of-the-art multi-gas monitoring solution designed for both industrial and environmental applications. Known for its accuracy, reliability, and advanced features, the ZV900 plays a crucial role in ensuring compliance with safety regulations and environmental standards.

One of the standout features of the GE ZV900 is its ability to measure a wide range of gases, including but not limited to carbon dioxide (CO2), oxygen (O2), nitrogen oxides (NOx), and particulates. This versatility makes it an ideal choice for facilities that require comprehensive air quality monitoring.

The ZV900 utilizes cutting-edge technology that incorporates advanced sensors and data analysis algorithms, allowing for real-time monitoring and reporting of gas concentrations. The high precision of these sensors ensures that users receive accurate and reliable data, which is critical when making operational decisions or responding to potential hazards.

In terms of connectivity, the GE ZV900 is equipped with options that support various communication protocols, such as MODBUS, BACnet, and Ethernet. This connectivity enables seamless integration into existing automation and monitoring systems, enhancing the overall functionality of the monitoring setup. Users can also access data remotely through cloud-based platforms, facilitating easier management and analysis of air quality metrics.

Another significant characteristic of the ZV900 is its user-friendly interface. The device features an intuitive touchscreen display that allows operators to easily navigate through different settings and view real-time data. This design ensures that even personnel with minimal training can effectively use the system to monitor gas concentrations and react to alerts.

Moreover, the GE ZV900 is built with durability in mind. It is designed to withstand harsh environmental conditions, making it suitable for various applications, including power generation, manufacturing, and environmental monitoring. The robust construction ensures longevity and reduces the need for frequent maintenance.

In conclusion, the GE ZV900 is a powerful, versatile, and reliable solution for multi-gas monitoring. Its advanced technologies, user-friendly design, and wide range of applications make it an essential tool for industries focused on safety and environmental stewardship. With the capability to provide real-time data and integrate seamlessly into existing systems, the ZV900 stands out as an essential asset in the quest for cleaner, safer air.