GE ZV900 Installation-Recirculating, Important Framing must be capable of supporting 100 lbs

Page 16

Installation Instructions

INSTALLATION—RECIRCULATING

DUCTWORK, WIRING LOCATIONS

Determine the exact location of the vent hood.

Locate the template packed with the literature.

Measure 36from the floor to the top of the cooking surface. Add hood installation height determined on page 7. Mark that location.

Ceiling

Tape the template in position along the penciled line.

CHECK TO BE SURE THE TEMPLATE IS LEVEL.

Use a level to draw a line straight up, from the centerline on the template to the ceiling.

HOUSE WIRING LOCATION:

The junction box is located on the top left side of the hood.

Wiring should enter the back wall at least 22above the bottom of the hood, and within 6of the centerline.

1INSTALL FRAMING FOR HOOD SUPPORT

IMPORTANT: Framing must be capable of supporting 100 lbs.

View from rear

cleats

1” x 6” min.

mounting

support

Centerline of

installation

space

If drywall is present, mark the screw hole locations for the top mounting brackets. Remove the template.

Cut away enough drywall to expose 2 vertical studs at the bracket location indicated on the template.

Install a horizontal support at least 1x 6between two wall studs at the bottom mounting bracket installation location. The horizontal support must be flush with the room side of the studs. Use cleats behind both sides of the support to secure to wall studs.

Reinstall drywall.

15

Image 16
Contents Installation Instructions Rear Wall Mounting Template Before YOU Begin Contents Installation OptionsAdvance Planning Power SupplyImportant Please read carefully Flexible ducting Duct FittingsDo not use flexible plastic ducting Remove the Packaging Tools and Materials Required not SuppliedHood 36 Min Vent hood must be installed 24″ min. Determine Installation Height30 Max Fasteners Wood 23-7/8 Check Installation Hardware11-1/2 Hood Thumb Attachment Screws DUCTWORK, Wiring Locations Install Framing for Hood SupportCeiling ducting Wall DuctingInstall Mounting Bracket Install Duct BracketCheck to be sure that the bracket is level Secure the bracket to the wallPrepare the Hood Mount the Hood Level the HoodConnect Ductwork Screw ScrewVerify that power is turned off at the source Connect ElectricalInstall Filters Install Duct CoversFinalize Installation INSTALLATION-RECIRCULATING Important Framing must be capable of supporting 100 lbsInstall Mounting Bracket Bottom view Dimension by 1″ to Facilitate installation Size and CUT Duct PieceInstall Duct Covers Install Filters Charcoal filterMetal filter Remove all tape and packing materialFor Monogram local service in your area, call
Related manuals
Manual 12 pages 60.71 Kb

ZV900 specifications

The GE ZV900 is a state-of-the-art multi-gas monitoring solution designed for both industrial and environmental applications. Known for its accuracy, reliability, and advanced features, the ZV900 plays a crucial role in ensuring compliance with safety regulations and environmental standards.

One of the standout features of the GE ZV900 is its ability to measure a wide range of gases, including but not limited to carbon dioxide (CO2), oxygen (O2), nitrogen oxides (NOx), and particulates. This versatility makes it an ideal choice for facilities that require comprehensive air quality monitoring.

The ZV900 utilizes cutting-edge technology that incorporates advanced sensors and data analysis algorithms, allowing for real-time monitoring and reporting of gas concentrations. The high precision of these sensors ensures that users receive accurate and reliable data, which is critical when making operational decisions or responding to potential hazards.

In terms of connectivity, the GE ZV900 is equipped with options that support various communication protocols, such as MODBUS, BACnet, and Ethernet. This connectivity enables seamless integration into existing automation and monitoring systems, enhancing the overall functionality of the monitoring setup. Users can also access data remotely through cloud-based platforms, facilitating easier management and analysis of air quality metrics.

Another significant characteristic of the ZV900 is its user-friendly interface. The device features an intuitive touchscreen display that allows operators to easily navigate through different settings and view real-time data. This design ensures that even personnel with minimal training can effectively use the system to monitor gas concentrations and react to alerts.

Moreover, the GE ZV900 is built with durability in mind. It is designed to withstand harsh environmental conditions, making it suitable for various applications, including power generation, manufacturing, and environmental monitoring. The robust construction ensures longevity and reduces the need for frequent maintenance.

In conclusion, the GE ZV900 is a powerful, versatile, and reliable solution for multi-gas monitoring. Its advanced technologies, user-friendly design, and wide range of applications make it an essential tool for industries focused on safety and environmental stewardship. With the capability to provide real-time data and integrate seamlessly into existing systems, the ZV900 stands out as an essential asset in the quest for cleaner, safer air.