GE ZV900 installation instructions Before YOU Begin

Page 3

Safety Information

BEFORE YOU BEGIN

Read these instructions completely and carefully.

IMPORTANT Save these instructions for local inspector’s use.

IMPORTANT Observe all governing codes and ordinances.

Note to Installer Be sure to leave these instructions with the Consumer.

Note to Consumer Keep these instructions with your Owner’s Manual for future reference.

Skill Level Installation of this appliance requires basic mechanical and electrical skills.

Completion Time — 1 to 3 Hours.

Proper installation is the responsibility of the installer. Product failure due to improper installation is not covered under the warranty.

For Monogram local service in your area, call 1.800.444.1845.

For Monogram service in Canada, call 1.888.880.3030 For Monogram Parts and Accessories, call 1.800.626.2002.

CAUTION:

Due to the weight and size of these vent hoods and to reduce the risk of personal injury or damage to the product, TWO PEOPLE ARE REQUIRED FOR PROPER

INSTALLATION.

PRUDENCE :

Àcause du poids et de la taille de ces hottes et pour reduire le risque de blessures et de dommages, IL FAUT

DEUX PERSONNES POUR FAIRE L’INSTALLATION CORRECTEMENT.

WARNING:

To reduce the risk of fire or electrical shock, do not

use this range hood with any external solid-state speed control device. Any such alteration from original factory wiring could result in damage to the unit and/or create an electrical safety hazard.

AVERTISSEMENT :

Pour réduire le risque d’incendie ou de choc électrique, il ne faut pas utiliser cette hotte avec un régulateur de vitesse électronique externe. Toute modification de ce type du branchement d’usine peute endommager l’appareil ou créer un risque de choc électrique.

TO REDUCE THE RISK OF FIRE, USE ONLY METAL DUCTWORK.

2

WARNING: TO REDUCE THE RISK OF FIRE, ELECTRICAL SHOCK OR INJURY TO PERSONS, OBSERVE THE FOLLOWING:

A.Use this unit only in the manner intended by the manufacturer. If you have any questions, contact the manufacturer.

B.Before servicing or cleaning unit, switch power off at the service panel and lock service panel to prevent power from being switched on accidentally. If the service panel cannot be locked, fasten a tag or prominent warning label to the panel.

AVERTISSEMENT :

POUR RÉDUIRE LE RISQUE D’INCENDIE, DE CHOC ÉLECTRIQUE OU DE BLESSURES, IL FAUT OBSERVER LES REGLES SUIVANTES :

A.Utiliser cet appareil uniquement de la maniére prévue par le fabricant. En cas de question, consulter le fabricant.

B.Avant toute intervention ou nettoyage, couper l’alimentation électrique au disjoncteur et verrouiller le panneau du disjoncteur pour éviter la mise sous tension accidentelle. S’il n’est pas possible de verrouiller le panneau du disconcteur, attacher un placard ou une étiquette trés visible au panneau.

For general ventilating use only. Do not use to exhaust hazardous or explosive materials or vapors.

Structural framing, installation work and electrical wiring must be done by qualified person(s)

in accordance with all applicable codes and standards including fire-rated construction.

Sufficient air is needed for proper combustion and exhausting of gases through the flue (chimney) of fuel burning equipment to prevent back drafting.

Follow the heating equipment manufacturer’s guidelines and safety standards such as those published by the National Fire Protection Association (NFPA), and the American Society for Heating, Refrigeration and Air Conditioning Engineers (ASHRAE), and the local code authorities.

Local codes vary. Installation of electrical connections and grounding must comply with applicable codes. In the absence of local codes, the vent should be installed in accordance with National Electrical Code ANSI/NFPA 70-1990 or latest edition.

CAUTION: To reduce risk of fire and to properly exhaust air, be sure to duct air outside—do not vent exhaust air into spaces within walls or ceilings or into attics, crawl spaces or garages.

PRUDENCE : Il faut prendre soin d’installer un conduit vers l’extérieur pour réduire le risque d’incendie et pouvoir évacuer l’air correctement. Il ne faut pas évacuer l’air correctement. Il ne faut pas évacuer l’air dans l’espace entre les parois d’un mur, un plafond ou un grenier, un espace sanitaire ou un garage.

Image 3
Contents Installation Instructions Rear Wall Mounting Template Before YOU Begin Installation Options ContentsPower Supply Advance PlanningImportant Please read carefully Duct Fittings Flexible ductingDo not use flexible plastic ducting Tools and Materials Required not Supplied Remove the PackagingDetermine Installation Height Hood 36 Min Vent hood must be installed 24″ min.30 Max Check Installation Hardware Fasteners Wood 23-7/811-1/2 Hood Thumb Attachment Screws Wall Ducting DUCTWORK, Wiring LocationsInstall Framing for Hood Support Ceiling ductingSecure the bracket to the wall Install Mounting BracketInstall Duct Bracket Check to be sure that the bracket is levelPrepare the Hood Screw Screw Mount the HoodLevel the Hood Connect DuctworkConnect Electrical Verify that power is turned off at the sourceInstall Duct Covers Install FiltersFinalize Installation Important Framing must be capable of supporting 100 lbs INSTALLATION-RECIRCULATINGInstall Mounting Bracket Bottom view Size and CUT Duct Piece Dimension by 1″ to Facilitate installationRemove all tape and packing material Install Duct Covers Install FiltersCharcoal filter Metal filterFor Monogram local service in your area, call
Related manuals
Manual 12 pages 60.71 Kb

ZV900 specifications

The GE ZV900 is a state-of-the-art multi-gas monitoring solution designed for both industrial and environmental applications. Known for its accuracy, reliability, and advanced features, the ZV900 plays a crucial role in ensuring compliance with safety regulations and environmental standards.

One of the standout features of the GE ZV900 is its ability to measure a wide range of gases, including but not limited to carbon dioxide (CO2), oxygen (O2), nitrogen oxides (NOx), and particulates. This versatility makes it an ideal choice for facilities that require comprehensive air quality monitoring.

The ZV900 utilizes cutting-edge technology that incorporates advanced sensors and data analysis algorithms, allowing for real-time monitoring and reporting of gas concentrations. The high precision of these sensors ensures that users receive accurate and reliable data, which is critical when making operational decisions or responding to potential hazards.

In terms of connectivity, the GE ZV900 is equipped with options that support various communication protocols, such as MODBUS, BACnet, and Ethernet. This connectivity enables seamless integration into existing automation and monitoring systems, enhancing the overall functionality of the monitoring setup. Users can also access data remotely through cloud-based platforms, facilitating easier management and analysis of air quality metrics.

Another significant characteristic of the ZV900 is its user-friendly interface. The device features an intuitive touchscreen display that allows operators to easily navigate through different settings and view real-time data. This design ensures that even personnel with minimal training can effectively use the system to monitor gas concentrations and react to alerts.

Moreover, the GE ZV900 is built with durability in mind. It is designed to withstand harsh environmental conditions, making it suitable for various applications, including power generation, manufacturing, and environmental monitoring. The robust construction ensures longevity and reduces the need for frequent maintenance.

In conclusion, the GE ZV900 is a powerful, versatile, and reliable solution for multi-gas monitoring. Its advanced technologies, user-friendly design, and wide range of applications make it an essential tool for industries focused on safety and environmental stewardship. With the capability to provide real-time data and integrate seamlessly into existing systems, the ZV900 stands out as an essential asset in the quest for cleaner, safer air.