GE ZV900 installation instructions Bottom view

Page 18

Installation Instructions

INSTALLATION—RECIRCULATING

4PREPARE THE HOOD

Place the hood on a padded surface.

Position the motor housing at the back of the hood. Electrical connectors should face the front, with rear mounting hooks at the back.

Slip the bottom flange of the motor housing into the side slots at the top rear opening.

Rear mounting

hooks

Rear view

Engage flange on motor

housing into slots

Carefully lay the hood on its back.

Fasten the hood to the motor housing from the bottom, using 6 screws.

Front side

Bottom view

Rear side

Join two cable connectors at the front of the hood.

To Lights

To

Control

Panel

5 MOUNT THE HOOD

WARNING: 2 people are required to lift and position the hood onto the mounting bracket.

AVERTISSEMENT :

If faut deux personnes pour lever et mettre en place la hotte sur le support de montage.

Lift the hood onto the mounting bracket.

Position a spirit level at the bottom of the hood to check side to side leveling.

6 LEVEL THE HOOD

This hood has built-in levelers on the mounting hooks at each side. Use a long Phillips screwdriver from the front to access the levelers.

Levelers

Use the top screw hole in the leveler to raise or lower the hood on that side.

Use the bottom screw hole to pull the hood tight against the wall surface.

Screw hole

Mark hole location at the bottom of the hood.

Remove the hood. If the bottom screw hole does not enter a stud, enlarge the hole to 3/8and install wall fastener anchors.

Place the hood back onto the mounting bracket, check level again and install the wall fastener.

17

Image 18
Contents Installation Instructions Rear Wall Mounting Template Before YOU Begin Contents Installation OptionsPower Supply Advance PlanningImportant Please read carefully Duct Fittings Flexible ductingDo not use flexible plastic ducting Remove the Packaging Tools and Materials Required not SuppliedDetermine Installation Height Hood 36 Min Vent hood must be installed 24″ min.30 Max Check Installation Hardware Fasteners Wood 23-7/811-1/2 Hood Thumb Attachment Screws Ceiling ducting DUCTWORK, Wiring LocationsInstall Framing for Hood Support Wall DuctingCheck to be sure that the bracket is level Install Mounting BracketInstall Duct Bracket Secure the bracket to the wallPrepare the Hood Connect Ductwork Mount the HoodLevel the Hood Screw ScrewVerify that power is turned off at the source Connect ElectricalInstall Duct Covers Install FiltersFinalize Installation INSTALLATION-RECIRCULATING Important Framing must be capable of supporting 100 lbsInstall Mounting Bracket Bottom view Dimension by 1″ to Facilitate installation Size and CUT Duct PieceMetal filter Install Duct Covers Install FiltersCharcoal filter Remove all tape and packing materialFor Monogram local service in your area, call
Related manuals
Manual 12 pages 60.71 Kb

ZV900 specifications

The GE ZV900 is a state-of-the-art multi-gas monitoring solution designed for both industrial and environmental applications. Known for its accuracy, reliability, and advanced features, the ZV900 plays a crucial role in ensuring compliance with safety regulations and environmental standards.

One of the standout features of the GE ZV900 is its ability to measure a wide range of gases, including but not limited to carbon dioxide (CO2), oxygen (O2), nitrogen oxides (NOx), and particulates. This versatility makes it an ideal choice for facilities that require comprehensive air quality monitoring.

The ZV900 utilizes cutting-edge technology that incorporates advanced sensors and data analysis algorithms, allowing for real-time monitoring and reporting of gas concentrations. The high precision of these sensors ensures that users receive accurate and reliable data, which is critical when making operational decisions or responding to potential hazards.

In terms of connectivity, the GE ZV900 is equipped with options that support various communication protocols, such as MODBUS, BACnet, and Ethernet. This connectivity enables seamless integration into existing automation and monitoring systems, enhancing the overall functionality of the monitoring setup. Users can also access data remotely through cloud-based platforms, facilitating easier management and analysis of air quality metrics.

Another significant characteristic of the ZV900 is its user-friendly interface. The device features an intuitive touchscreen display that allows operators to easily navigate through different settings and view real-time data. This design ensures that even personnel with minimal training can effectively use the system to monitor gas concentrations and react to alerts.

Moreover, the GE ZV900 is built with durability in mind. It is designed to withstand harsh environmental conditions, making it suitable for various applications, including power generation, manufacturing, and environmental monitoring. The robust construction ensures longevity and reduces the need for frequent maintenance.

In conclusion, the GE ZV900 is a powerful, versatile, and reliable solution for multi-gas monitoring. Its advanced technologies, user-friendly design, and wide range of applications make it an essential tool for industries focused on safety and environmental stewardship. With the capability to provide real-time data and integrate seamlessly into existing systems, the ZV900 stands out as an essential asset in the quest for cleaner, safer air.