GE ZV541, ZV421 Construct Ceiling Support, Plan the Location of the Hood and Ductwork

Page 10

Installation Instructions

STEP 1 CONSTRUCT CEILING SUPPORT

Plan the Location of the Hood and Ductwork

Use a plumb bob to check the location. The countertop/cooktop below the hood must be centered with the hood.

Ceiling

Hood

Ducting

Centerline

Front

15-7/8"

Align With

31-3/4"

Cooktop

Center of

Cooktop

 

 

Countertop

The hood should extend beyond the front and rear edge of the cooking appliance.

The duct in the ceiling must be centered over the cooktop.

Ceiling

Hood

Ducting

Centerline

Front

18-1/8"

Align With

36-1/4"

Cooktop

Center of

Cooktop

 

 

Countertop

42" Hood Side View

54" Hood Side View

Ceiling Support Structure

 

 

 

 

 

 

• At the hood location, install 2 x 4 cross framing between

• Arrange cross framing in the ceiling to suit the existing

ceiling joists as shown. (2x4’s are required to support the

structure.

weight of the hood.)

 

 

 

 

 

• Your ceiling joists will be like one of the following

 

 

 

 

 

 

 

examples.

 

 

 

 

 

 

 

 

 

 

 

12-3/4” (42” Hood)

 

 

 

 

17” (54” Hood) Install

 

 

EXAMPLE A

 

 

 

 

 

 

 

Cross-Framing

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Symmetrically About

 

 

 

 

 

 

 

 

 

 

 

 

Duct/Cooktop Centerline

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

8 5/8”

 

 

 

 

16

Joist

 

 

 

 

 

10” Duct

 

 

 

 

 

 

 

Spacing

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

2x4 Cross

Framing

Front

of

Hood

Align ductCooktop to center of

Cooktop

Outline

Top View – Ceiling Joists Parallel to Front of Hood

10

Image 10
Contents Installation Instructions To Reduce the Risk of FIRE, USE only Metal Ductwork For Proper InstallationPour Faire UNE Installation Correcte Faut Observer LES Regles SuivantesContents Hood DimensionsZV42I Duct Cover AccessoriesProduct Clearances ZV54IPower Supply Advance PlanningFt. Ceiling Determine Installation HeightAccessories SuppliedDuct Fittings Flexible ductingRemove the Packaging Tools and Materials RequiredBe careful not to scratch the hood Hardware Package Accessory PackageParts Provided Locate the parts packed with the hoodConstruct Ceiling Support Plan the Location of the Hood and DuctworkAlign duct JoistSpacing DuctDuctwork Finish the CeilingMount Template Size and Install DuctworkRock Adjust telescoping accessory frame to length Install Accessory or Supplied Support and Duct CoversSecure house wiring Connect Duct Install HoodTighten the screws Install Safety Screws Bumper Pads Duct Transition Attachment ScrewsVerify that power is turned off at the source Install the MotorConnect Electrical Slide Duct Cover Down Install Filters Install RodsSkip this Step if Using the Supplied Duct Cover Slide the lower duct cover down onto the hoodFinalize Installation Install DuctCheck appearance and installation Installation ChecklistCheck Blower Safety Screw Check Operating Sound and Proper Air-FlowGE Consumer & Industrial

ZV421, ZV541 specifications

The GE ZV541 and ZV421 are prominent offerings in the realm of multi-function medical imaging devices, widely recognized for their advanced features, robust technologies, and user-friendly characteristics that cater to the needs of healthcare professionals.

The GE ZV541 is designed primarily for a wide range of imaging applications, including vascular, cardiac, and general imaging. One of its most outstanding features is its cutting-edge imaging technology, which employs advanced digital signal processing to produce high-resolution images with exceptional clarity. This enables practitioners to make accurate diagnoses and evaluate complex conditions with confidence. The ZV541 also integrates automated image optimization algorithms, ensuring that images are consistently of high quality, regardless of the operator's experience level.

Additionally, the ZV541 offers a range of versatility with its multi-modal capabilities, allowing it to perform ultrasound imaging alongside other imaging techniques. This flexibility is critical in a busy clinical environment where different modalities might be required for patient assessment. Its user-friendly interface simplifies navigation, enabling practitioners to focus more on patient care rather than on the technical complexities of the equipment.

On the other hand, the GE ZV421 excels in providing compact and reliable imaging solutions, particularly in settings where space and portability are key considerations. It retains many of the advanced imaging capabilities of its larger counterpart while being designed for ease of transport and quick setup. The ZV421 incorporates similar digital enhancement technologies that ensure high-quality output with quick turnaround times.

Both devices are equipped with intuitive touchscreen controls that enhance the user experience, making it easier to adjust settings and quickly access frequently used features. They also come with integrated data management systems that facilitate seamless sharing and storage of patient data, complying with modern healthcare standards for efficiency and security.

In summary, the GE ZV541 and ZV421 combine state-of-the-art imaging technologies with versatility and user-friendly designs. These devices are ideal for healthcare environments that require reliable performance along with superior diagnostic capabilities. Their features not only improve workflow but also enhance the overall quality of patient care, making them invaluable tools in contemporary medical practices.