Greenheck Fan PN 458294 manual Full Enclosure Panels

Page 10

Full Enclosure Panels

Before installing the enclosure panels, make sure the hood is hung in position with all the ductwork attached and fire system connections completed.

1.Tack-weld or clamp end enclosure panels onto standing seam (clamps provided).

2.Attach the end enclosure panels to the wall (fasteners by others).

3.Position the front enclosure panel(s) on the hood and bolt to the end enclosure panels with the 5/16 in. bolts provided.

4.Tack-weld or clamp the front enclosure panel(s) to the standing seam. If clamps are used, they must be positioned 4 in. (100 mm) from the ends and in the center of the front enclosure panel.

5.To allow for ease of cleaning, caulk the external seams with NSF Approved silicone caulk. (GE SCS1009, or its equivalent). The caulk is not provided.

6.Installation instructions may not be applicable for concrete ceilings.

End Enclosures

Bolt Here

Front Enclosure(s)

Standing Seams

Fig. 15

 

10 Proximity Hood

®

Image 10
Contents Installation, Operation and Maintenance Manual Table of Contents Hood Weights Receiving and HandlingHood Installation Overview InstallationRear Filler Panel Installation Instructions Hood Hanging Height End Filler Panel Installation InstructionsContinuous Capture Plenum Hoods Supply Ductwork ExhaustElectrical Connections External Supply Plenum Installation Installation InstructionsInstalling the Back Supply Plenum Hanging the Back Supply PlenumHanging the Hood with Back Supply Plenum Hood Mounting InstructionsFull Enclosure Panels Plate Shelf with Duct Enclosure Panels Passover Shelf with Duct Enclosure Panels Backsplash Panel Installation Instructions Flat Backsplash PanelDuct Collar Installation Fire System InstallationExhaust Air Balancing Baffles Eabb Checking for BalanceTesting Hood Air Volume Baffle Filter Style Hoods Exhaust Balancing the Kitchen Exhaust SystemRotating Vane Anemometer Supply If Applicable Example for Perforated Face Supply185 + 187.0 fpm High Velocity Cartridge Filters Exhaust Example282 fpm 423.0 cfm Volume with a rotating vane anemometer as follows 1042 4012 m3/hr Amerex Wiring Plan View PRMAnsul Wiring Plan View EquipmentOverall Wiring Plan View HoodWiring for Switch Panels Weekly Maintenance Maintenance Daily MaintenancePeriodic Maintenance Proximity Hood Grease Grabber Filter Cleaning Frequent MaintenanceFilter Washing Frequency Guide Equipment Required CyclesTroubleshooting Problem Cold air can be felt by the cook at the hood Replacement Parts Maintenance Log Warranty