Fisher & Paykel CP-484GG, CP-486GD, CP-364GD Gas Hook-Up, GAS Requirements, Natural GAS, Lp Gas

Page 18

GAS HOOK-UP

GAS REQUIREMENTS

Verify the type of gas supplied to the location. The cooktop is shipped from the factory set up and adjusted for Natural Gas or LP (propane), depending on the specific model ordered. Verify that the cooktop is compatible with gas supply at the installation site before proceeding further. Return the cooktop to the dealer if the unit is not set for the gas supplied at the site.

NATURAL GAS

■ Connection: 1/2” NPT Minimum 5/8” dia. flex line. ■ Supply Pressure: 6” to 14” W.C.

LP GAS

■ Connection: 1/2” NPT Minimum 5/8 dia. flex line. ■ Supply Pressure: 11” to 14” W.C.

A regulator is required at the LP source to provide a maximum of 14” W.C. to the cooktop regulator.

HOOK-UP TO GAS SUPPLY

A manual valve must be installed external to the appliance, in an accessible location from the front for the purpose of shutting off the gas supply (Fig. 11). Make sure the gas supply is turned off at the wall valve before connecting the appliance. The gas supply connections should be made by a qualified technician and in accordance with local codes or ordinances. In the absence of a local code, the installation must conform to the latest edition of National Fuel Gas Code ANSI Z223.1.

To prepare the unit for connection to the gas supply, thread the supplied 1/2” pipe nipple into the elbow on the end of the manifold. The elbow is located inside the chassis of the unit, on the end of the manifold, facing down. See fig.12. It is accessible through the square cutout in the left rear corner of the chassis bottom. Connect the outlet of the regulator to the exposed end of the nipple, connect the flex line from the gas supply to the inlet side of the regulator.

NOTE:

Pipe seals must be used on all pipe threads.

Flex Line to Cooktop

!Manual Shut-Off Valve must be Easily Accessible

Fig. 11

CAUTION:

The appliance must be isolated from the building’s gas supply piping system by closing its individual manual shut-off valve during any pressure testing of the gas supply piping system at test pressures equal to or less than 1/2 psig (3.5kPa.). The appliance and its individual shut-off valve must be disconnected from the gas supply piping system during any pressure testing of the system at the test pressures in excess of

 

Bottom of unit

Threading compound

Coupling

1/2 NPT black

must be resistant to LP gas

 

 

1/2 NPT

 

Close Nipple

1/2 psig (3.5kPa.). When checking the manifold gas pressure, the inlet pressure to the regulator should be at least 7.0”W.C. for natural gas or 12.0” for LP.

NOTE:

The arrow on the regulator indicating direction of gas flow should be pointing towards the unit. The flex line for the gas supply must be metal and be approved by an approved certifying agency (AGA, CGA, or UL). Never use a hose made of rubber or other synthetic material, as the heat may cause the hose to melt and develop leaks.

1/2 x 5" NPT Close Nipple

Installer supplied shut-off valve must be easily accessible*

*Installation must conform with local codes or with the National Fuel Gas Code ANSI Z223.1 or the CAN/CGA-B149.2 Propane Installation Code

Regulator LP/NG (included)

Adapter 1/2 NPT to 3/8 flare fitting

Do not put threading compound on these threads

Fig. 12

16

Image 18
Contents CP Series Professional GAS Cooktop ModelsPage Message to OUR Customers Please Retain this Manual for Future ReferenceTable of Contents Important Installation Information IntroductionSafety Practices and Precautions Safety Practices and Precautions Recommendations on HOOK-UP to GAS Supply Models CP Cooktop ModelsPlanning the Installation Recommended Installation Instruction Unpacking and HandlingMoving and Placing the Cooktop Anchoring the Cooktop Standard Counter Island Installation Ventilation RequirementsCabinet Preparation Electrical Gas SupplyFrom standard depth cabinet Cabinet face for installation with flush control panel Electrical Requirements Backguard InstallationElectrical Connections Recommended Grounding MethodNatural GAS GAS HOOK-UPGAS Requirements LP GASCooktop Burners Test and AdjustmentsThis Adjustment Section Applies to the Griddle Cooktop Burner Lighting NoteCleaning Exterior Surfaces Electrical Installer Final ChecklistGeneral GAS SupplyHOW to Obtain Service Before YOU Call for ServiceHOW Long does this Limited Warranty LAST? WarrantyLimited Warranty This Warranty does not CoverHOW to GET Service Commercial USENo Other Warranties Page Page Table DE Cuisson À GAZ Professionnelle DE Série CP ModèlesLintention DE NOS Clients Veuillez Conserver CE Manuel À Titre DE RéférenceEssai ET Réglages Informations Importantes Concernant Linstallation Mesures DE Sécurité ET DE Précaution Mesures DE Sécurité ET DE Précaution Recommandations Concernant LE Branchement DU GAZ RemarqueModèles DE Tables DE Cuisson CP 48 PO Modèles DE Tables DE Cuisson CP 36 POPlanification DE Linstallation Numéro de modèleInstructions Concernant Linstallation Recommandée Déplacement ET Placement DE LA Table DE CuissonDéballage ET Manipulation Ancrage DE LA Table DE Cuisson Appareil de Recommandations Exigences EN Matière DE VentilationPréparation DES Armoires Hotte de 48 po de largeur min Hotte de 36 po de largeur min25 3/465,4cabinetcm 25d3/4eppoth required 67,3 cm 26-1/2 po Niveau du comptoir Connexions Électriques Installation DU DosseretMéthode DE Mise À LA Terre Recommandée Connexions ÉlectriquesGAZ Naturel Branchement DU GAZExigences Concernant LE GAZ Branchement DU GAZEssai ET Réglages Table DE Cuisson BrûleursNettoyage DES Surfaces Extérieures ÉLECTRIQUE/CARACTÉRISTIQUES Électriques Liste DE Contrôle Finale DE LinstallateurGénéralités Alimentation EN GAZPour Lobtention DE Service Avant Dappeler LE Service TechniqueSI LES Brûleurs DE LA Table DE Cuisson NE Sallument PAS Quelle EST LA Durée DE Cette Garantie LIMITÉE? GarantieFisher & Paykel Sengage À NE Sont PAS Couverts PAR LA GarantiePour Obtenir DES Réparations Utilisation CommercialeAucune Autre Garantie Remarque