Thermador HMWB30, HMWB36 installation manual Wall Mount Installation

Page 9

Wall Mount Installation

Note: see below if cabinet installation is preferred

3.After the hood installation height has been determined draw a horizontal line at a distance above the cooktop equal to the desired hood installation height plus 7- 1/2”. See also Figure 4a.

4.Find the centerline of the cooktop. Draw a vertical line along this centerline up to the hori- zontal line drawn in step 1 and draw a vertical line right and left at a distance of12-5/8” to determine the mounting locationof the mounting hooks shipped with the hood.

5.Fit two mounting hooks on the wall to hang the hood through the provided slots (2 wall anchors + 2 hooks + 2 screws 5x35).

6.Run 10” Duct, long enough to reach the transition once the hood has been installed plus 1 1/2” inch to connect ductwork. Fix Duct to transition with screws and seal withtape.

7.Remove 1 of 2 knockouts and install 1/2” conduit connector in j-box.

8.Hang the hood and adjust its position through the screws on the hooks.

9.Fix the hood to 4 additional point, 2 on upperside, 2 on lower side (use 4 wall anchors

+4washers + 4 screws 5x35.

Cabinet Installation:

Note: See above if wall mount installation is preferred

Note: Distances on Table 3.3.

Find the centerline of the cabinet bottom. Draw a line along this centerline from rear to front of the cabinet. See also Figure 4b.

4.Draw two lines, one at a K distance from thewall, the other one at a Z distance from theprevious line. Mark 4 points, two along each line at a distance of half W from the center line, to determine the screw locations.

5.Fit 4 screws on cabinet bottom do not tighten completely but leave a space of about 1/2” from cabinet bottom surface and head screws.

6.Run 10” Duct, long enough to reach the transition once the hood has been installed plus1 1/2” inch for connect ductwork.

7.Remove 1 of 2 knockouts and install 1/2”conduit connector in j-box.

8.Hang the hood on screws through side slots provided on hood top.Tighten the four screws. Note: If possible fix the hood on the wall at 4 additional point (2 on upper side, 2 on lowerside).

9.From the inside of the cabinet attach the transition on upper outlet.

HOO D W IDTH

DIM. "W "

DIM. "K "

DIM. "Z"

30"

29 - 1/8"

2

- 1/2"

7

- 1/16"

36"

35 - 1/16"

2

- 1/2"

7

- 1/16"

Table 3

Figure 4a

Side slot x 4

 

Center Hole

Figure 4b

9

Image 9
Contents N T I L AT I O N Install Ation Manual Page Important Safety Instructions Electrical requirements Installing the Hood Choose vent options  Typical installationVentilator performance calculation Transition Screws Wall Mount Installation For both ins tallation method Importantes Instructions DE Sécurité Importantes Instructions DE Securité Spécifications pour l’installation élec- triquePièces non fournies avec votre hotte Installation DE LA HotteExemples de possibles types d’extraction/evacuation Installation typiqueTabla 1. Calcul de performances de ventilation Ajustage/dimensionsVisses Installation SUR MUR Figura Advertencia Requerimientos eléctricos Instrucciones DE Seguridad ImportantesInstalando LA Campana Ejemplos de posible intalación Tabla 1. Cálculo de funcionamiento de Ventilación Transición Tornillos Instalación en gabinete Instalación a paredInstrucciones Para Tierra Electrica