LG Electronics LMV1630WW, LMV1630BB installation instructions ROOF-VENTED Installation

Page 12

STEP 3: Prepare The Venting Blower

ROOF-VENTED INSTALLATION:

1.Remove one blower unit mounting screw and one or several blower plate mounting screw(s). Remove the blower plate from cabinet. See Figure 19.

2.Carefully lift the blower unit out of the microwave oven.

3.Rotate blower unit 90˚so the exhaust ports face the top of the cabinet. See Figure 20.

4.Place blower unit back into microwave oven.

5.Use side cutter or tin snips to cut and remove knockouts

"A" from blower plate. Discard knockouts. Be careful not to distort the plate. See Figure 21.

6. Reattach blower plate to microwave oven.

Attach with the one blower unit mounting screw and then the two blower plate mounting screws . See Figure 22.

blower plate mounting screws

blower plate

blower unit mounting screw

Figure 19

Blower Unit

Figure 20

Knockouts "A"

blower unit

blower plate

 

 

mounting

 

 

screws

blower plate

 

blower plate

blower unit

Figure 21

mounting screws

Figure 22

– 12

Image 12
Contents Microwave Oven Your Safety First For Your SafetyThis Appliance Must be Grounded Make Sure YOU have Enough Space and Support Damper/duct connector Four 1/4 x 2 lag screws Actual SizeTwo tapping screws Actual Size Stud Finder or Thin Nail Power-Supply-Cord Hole Prepare The Electrical ConnectionUpper Cabinet Grounded Outlet Prepare The Venting System Wall VentingRoof Venting Room VentingStandard Fittings Duct Length Exceed 140 feet73 ft Prepare The Venting Blower Electrical Shock HAZARD! Unplug Unit Before Working on ITWALL-VENTED Installation ROOF-VENTED Installation Prepare The Wall & Upper Cabinet Drill The Holes In The Wall And Upper Cabinet Rear Wall TemplateInstall The Mounting Plate Oven Must Be Connected To At Least One Wall StudFor Wall-Vented Attach The Oven To The Wall Cord