U-Line 75WC, 75R, 75BEV manual Product Dimensions, Door Swing/Clearances Information

Page 5

75R, 75WC and 75BEV Models

Product Dimensions

23-7/16"

24"

Including

Including

Handle

Handle

34-1/8"

34-1/8"

23-15/16"

23-15/16"

Black and White Refrigerator 75R

Stainless Refrigerator 75R

and

and

Black Wine Captain® 75WC

Stainless Wine Captain® 75WC

25-7/16"

 

Including

 

Handle

 

 

34-1/8"

23-15/16"

 

Beverage Center 75BEV

Figure 2

 

Please note that the unit has adjustable feet that can add one additional inch to height during leveling or to match adjacent cabinets (see Figure 20 on Page 11).

Door Swing/Clearances Information

Black and White 75R units have a zero clearance for the door to open 90° (see Figure 3). Stainless 75R and 75WC units require a minimum of 9/16", Black 75WC units require a minimum of 3/16" and 75BEV units require

a minimum of 2" door clearance to accommodate the handle if the unit is installed next to a wall or similar type of structure.

Wall

Wall

1/4" Min.

11/16" Min.

20-7/8"

20-7/8"

25-1/2"

25-1/4"

90

90

Door Swing

Door Swing

Black and White Refrigerator 75R

Stainless Refrigerator 75R

and

and

Black Wine Captain® 75WC

Stainless Wine Captain® 75WC

Wall

 

2" Min.

 

 

20-7/8"

 

25-1/4"

90

 

Door Swing

 

Beverage Center 75BEV

Figure 3

 

02/2005

5

www.U-LineService.com

Image 5
Contents 75R Refrigerator 75WC Wine Captain and 75BEV Beverage Center Follow Safety Precautions ContentsInspect and Plan General PrecautionsTools/Materials Required InspectionPrepare Site Exterior CleaningCut-Out Dimensions Door Swing/Clearances Information Product DimensionsBlack and White 75R Units Reversing the DoorPower Supply Side-By-Side Installation InstructionsOther Site Requirements Stainless 75R Units and All 75WC UnitsDoor Panel Installation Prepare/Install Door Panel or Prepare RacksCustom 1/4 Thick Door Panel Insert Door Panel PreparationStaining Wood Trim a Different Color Adding a Final Finish Coat to Wood TrimAdjust Door Electrical SpecificationsPrepare Power Supply Checking Door AlignmentGrille Installation Leveling Information Installation of the 75R/75WC/75BEVInstallation Tip Level the Unit Install the UnitStart-Up Troubleshooting Glass Shelf InstallationInitial Start-Up Start-Up for the First TimeWho to Call Service Information