U-Line 2075WCOL manual Staining Wood Trim a Different Color, Overlay Frame, Frame Preparation

Page 8

2075WC/2075WCOL Wine Captain®

 

 

Staining Wood Trim a Different Color

1.Remove each wine rack by sliding it out and up. See Figure 12.

2.Remove and save screws securing wood trim to the racks.

3.Apply Minwax Water-Based Wood Stain to wood with a synthetic foam brush. Stain must penetrate approximately 3 minutes. After this period, while stain is still wet, take a stain-dampened rag and remove all excess stain. Wipe in the direction of the grain with medium pressure to achieve the desired stain color.

4.After 2 hours, repeat Step 3.

5.Allow stain to dry for a minimum of 3 hours before finishing.

6.Sand the wood with very fine sandpaper to smooth the surface from the staining process.

7.Remove sanding dust with a tack cloth.

8.Apply a thin coat of Minwax Polycrylic, following container label for directions. Allow to dry 24 hours.

9.Lightly sand, tack and reapply 2 times, if desired.

10.Allow the final coat to dry for 24 hours.

11.Reinstall wood trim to wine racks using screws removed in Step 2.

12.Reinstall wine racks in unit.

13.For 2075WC units, go on to 5 Adjust Door.

Overlay Frame

(2075WCOL Units Only)

Frame Preparation

An overlay frame covers the door frame to give a built-in appearance. Appropriate hardware and a copy of these instructions will be included in the unit.

IMPORTANT

The thickness of the wood overlay frame must be 3/4". The door frame must not weigh more than 20 lbs.

1.Create an overlay frame to the dimensions shown in Figure 13.

3/4"

 

13/16"

 

Relief Notch for Pivot Plate

 

(Right Hand Hinge Shown)

 

1/8"

 

1/8"

 

Rear View

30"

of

 

Wood Frame

27-3/4"

 

21-1/2"

 

23-3/4"

 

Figure 13

 

IMPORTANT

Rear View of wood frame for right-hand hinge shown.

Use mirror image for left-hand hinges.

www.U-LineService.com

8

02/2005

Image 8
Contents 2075WC Wine Captain 2075WCOL Wine Captain with Overlay Contents Follow Safety PrecautionsGeneral Precautions Inspect and PlanTools/Materials Required InspectionPrepare Site Exterior CleaningCut-Out Dimensions Reversing the Door Product Dimensions Door Swing/Clearances Information Environmental Requirements Power SupplyOther Site Requirements Prepare Racks and Door Frame Side-By-Side Installation InstructionsAdding a Final Finish Coat to Wood Trim Frame Preparation Staining Wood Trim a Different ColorOverlay Frame Typical routing dimensions are shown in Figure Installation Instructions Preparing DoorGo on to 5 Adjust Door Checking Door Alignment Adjusting Door AlignmentAdjust Door Electrical Specifications Installation TipPrepare Power Supply Leveling InformationAnti-Tip Bracket Installation Install the UnitStart-Up for the First Time Installation TroubleshootingInitial Start-Up Start-Up Troubleshooting Service Information Who to Call