Andrew 5.6-Meter ESA manual Step

Page 22

Step 10

Step 11

Attach 300026 tripod channel legs to 300029 tripod joint bracket as shown in Figure 23.

Use 7/8 x 2-1/4 in (57 mm) bolt, flatwasher and nut

Insert bolts from channel leg to joint bracket

Figure 23

Attach 300010 tripod tube weldment to 300026 tripod channel legs as shown in Figure 24.

Use 7/8 x 2-1/4 in (57 mm) bolt, flatwasher and nut

Insert bolt from channel leg to tube weldment

Figure 24

22

Installation Procedures

Image 22
Contents Meter ESA Table of Contents Meter Earth Station Antenna IntroductionCustomer Service Center Proprietary Data Information and Assistance TechnicalOverview Content How to Use This ManualOverview Getting StartedRecommended Tools Tool Size QuantityGetting Started Returning Equipment Step Installation Procedures Overview Foundation PreparationTensioning Step 1b A-325 Tensioning For bolts over four diametersTripod Ground Mount Assembly Azimuth Beam Step Support Legs Assembly Step Step Step Panning Frame Assembly Step Step Step Step Step Step Step Elevation Jackscrew Assembly Step Step Azimuth Jackscrew Assembly Step Mount Assembly Step Step Step Step 22193/223180 Installation Procedures Installation Procedures Installation Procedures Installation Procedures Installation Procedures Installation Procedures Installation Procedures Installation Procedures Installation Procedures Overview Acquiring a Satellite OperationStep Polarization at 45 degrees from Optimum Setting Maximizing Odd Transponders Subreflector Adjustment Overview General Cleaning Electrical Parts Preventive MaintenancePreventive Maintenance Antenna Preventive Maintenance Drive System Voltage Current Checks Step Step Preventive Maintenance Jackscrews/Motors Gear Motor/Housing Fill Drain Requirements Lubrication Chart High-Speed Antenna Lubrication Points Medium-Speed Antenna Lubrication Points