Cornelius SID650A/80-BC, SID650W/80 Operating Instructions, Harvest Cycle Time Cam Switch Action

Page 12

OPERATING INSTRUCTIONS

A temperature sensing control bulb located in the storage hopper starts and stops the ice-making process in response to ice level in the hopper. With this ice level control “calling”for ice (hopper ice level is low), ice begins to form on the stainless steel tubing coils in the evaporator section of the ice-maker. Ice continues to “grow”on the evaporator coil until it contacts the ice thickness probe (low voltage conductivity sensor). At this point, the conductivity probe triggers the harvest timer motor. The harvest timer contains five (5) cam operated switches which function as detailed in the following table.

 

Table 3. HARVEST CYCLE

 

Time

Cam Switch

Action

0--86 Seconds

#1

Timer motor energized.

1--23 Seconds

#4

Water dump valve open.

1--36 Seconds

#2

Hot gas solenoid valve open.

 

 

Air pump off.

 

 

Condenser fan motor off.

36--90 Seconds

#2

Air pump on.

 

 

Condenser fan motor on.

 

 

Hot gas solenoid valve closed.

35--60 Seconds

#3

Harvest motor on.

44--48 Seconds

#5

Hopper agitator motor operates.

When ice contacts the ice lever control bulb in the storage hopper, the control will shut down the refrigeration system. If this signal occurs during the harvest cycle, the harvest cycle will be completed before shutdown occurs.

To dispense ice, push the lever located on the lower front panel. Ice will flow from the ice chute until the lever is released.

For units with a built-in cold plate, ice will automatically fill the cold plate cabinet. Allow one (1) hour for the cold plate to reach its maximum capacity. Start up the beverage system and adjust the faucets to the proper brix. Pushing the lever on any faucet will provide beverage of the appropriate flavor.

9

91704

Image 12
Contents Spiral Icemaker Dispenser Table of Contents Table of Contents cont’d General Information DescriptionInstallation Instructions Installation InstructionsUnpacking Instructions Electrical Wiring Installation Instructions Installations Dimensions Mounting Template Model SID650-80 Beverage System START-UPBeverage System Schematic B Models Beverage System Schematic BC Models Harvest Cycle Time Cam Switch Action Operating InstructionsWiring Schematic Wiring Diagram Refrigeration Schematic Maintenance Cleaning InstructionsDispenser Section For Units with Beverage System Cold Plate91704 Troubleshooting Guide 91704 91704 Is ICE Production ICE Maker Problem YES RUN RUN/STOP Stop Hopper YES Present AT No ICE on Evaporator Harvest YES 10%? Adjust ICE Thickness Probe only After ALL OTH LOW ICE Production 91704 Dispenser Problem YES Does 91704 MAINTENANCE/ADJUSTMENT Procedures BIN ThermostatCLEANING/REPLACE the Filter Harvest Time Adjustment Distributed By Commercial Refrigeration Service, Inc Parts List Description Part NumbersParts List CONT’D Air Cooled Water Cooled Refrigeration Components 80 BCWarranty Remcor Incorporated Regency Drive Glendale Heights, IL 708