Installation, Start-Up and
Service Instructions
CONTENTS
Page
SAFETY CONSIDERATIONS . . . . . . . . . . . . . . . . . . . . . . . 1 INTRODUCTION. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1
INSTALLATION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
•
•COUPLED APPLICATIONS
Step 3 — Rigging and Handling . . . . . . . . . . . . . . . . . 45
• MOUNTING THE UNIT INDOORS
Step 4 — Installing ERV Transitions . . . . . . . . . . . . . . . 47
• ERV UNIT COUPLED WITH A 3 TO 12 1/2 TON HVAC UNIT
Step 5 — Make Electrical Connections . . . . . . . . . . . . 47
•POWER SUPPLY
•ELECTRICAL CONNECTIONS
Unit Preparation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 59
Internal Wiring . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 59
Rain Hoods . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 59
Energy Recovery Wheel . . . . . . . . . . . . . . . . . . . . . . . . . 59
•DRIVE BELT
•AIR SEALS
Blower Rotation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 59
Airflow Settings and Adjustments. . . . . . . . . . . . . . . 59
•FACTORY SETTING
•CURVE SELECTION
•ADJUST THE ERV BLOWER SPEED
•MEASURE MOTOR VOLTAGE, AMPERAGE AND FAN RPM
•BELT MAINTENANCE
Variable Air Volume Option. . . . . . . . . . . . . . . . . . . . . . 74 Operating Sequence . . . . . . . . . . . . . . . . . . . . . . . . . . . . 74
•OCCUPIED MODE
•UNOCCUPIED MODE
SERVICE . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Removing Wheel Segments for Cleaning
Removing and Installing
Wheel for Cleaning (62M040 Units). . . . . . . . . . . . 75
Removing and Installing
Wheel for Cleaning (62M075,120 Units) . . . . . . . 76 Installing Wheel Segments
MAINTENANCE . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .78,79 START UP CHECKLIST . . . . . . . . . . . . . . . . . . . . . . . .
SAFETY CONSIDERATIONS
Installation and servicing of
Untrained personnel can perform the basic maintenance functions of cleaning coils and filters and replacing filters. All other operations should be performed by trained service personnel. When working on
Follow all safety codes. Wear safety glasses and work gloves. These instructions describe how to install, start up, and service 62M energy recovery ventilator units.
Electrical shock can cause personal injury and death. Shut off all power to this equipment during installation. There may be more than one disconnect switch. Tag all discon- nect locations to alert others not to restore power until work is completed.
INTRODUCTION
The 62M energy recovery ventilator (ERV) units recover energy from building exhaust air and
The 62MB and MC vertical discharge units are used when a
The 62MD and ME horizontal discharge unit can be used as a
INSTALLATION
Step 1 — Inspection — Inspect the unit; file a claim with the shipping company if the unit is damaged. Check the packing list to ensure that the correct items have been received and notify your Carrier representative of any discrepancy.
Step 2 — Install Roof Curb
When installing a
Locate the Roof Curb — Prior to locating the roof curb con- sider the structural support required for the rooftop system and, the duct drop location in relation to the joists. Allow sufficient space for service, clearance, and locations of vents or other sources of air.
Manufacturer reserves the right to discontinue, or change at any time, specifications or designs without notice and without incurring obligations.