2.0INSTALLATION (Continued)
PERFORMANCE CHECK
The following items should be checked before or within the first 30 days of operation by a qualified service technician.
1.Verify correct gas type against rating plate on unit.
2.Verify correct voltage, cycle and phase against rating plate on unit.
3.Gas pressure.
4.Internal gas connections.
5.Internal electrical connections.
6.Burners - adjustment and ignition.
7.Thermostat - cycle for operation check.
8.Gas supply valve - check for operation.
9.Check hinge and lid assembly.
10.
11.Advise user on cleaning procedure.
9